Quick answers
What is this project?
Work of Strengthening & Rehabilitation of Water Supply for Kekri-Sarwar Sector Together with Water Production System of Ajmer District, Source Bisalpur Dam Package-III (WTP at Kekri & Clear Water Transmission System form WTP Kektri to Nasirabad CWR) under JJM with Operation and maintenance for Ten (10) Years After Defect Liability Period of One (1) Year is a proposed pipeline project in Arwar, Sarwar, Ajmer, Rajasthan. The site covers 697.9 acres.
Who is building it?
The applicant is Executive Engineer PHED Project Division Nasirabad Ajmer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Arwar, Sarwar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹385.2 crore; a site of 697.9 acres and 3,170 m² of forest land.
When was it filed?
The application was filed on 9 Jun 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 9 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer PHED Project Division Nasirabad Ajmer |
| Land area | 697.9 acres (282.4 ha) |
| Forest land | 3,170 m² |
| Project cost | ₹385.2 crore |
| Village / locality | Arwar |
| Taluk / tehsil | Sarwar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36685 |
In context
5 applications in Ajmer since January 2022 are in the same category (Pipelines): 1 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arwar, Sarwar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Quartz, Feldspar and Mica Mining Project , M.L. No. 73/2001 — environmental approval granted, 2.4 km away
- M/s Jai Jinendra Marbles, Quartz & Feldspar Mine, M.L No-48/2007 — lapsed, 5.3 km away
- Proposed Masonry Stone Mining Project, Area- 1.1894 Ha., M.L. No,- 48/2022,… — environmental approval granted, 5.3 km away
- "Granite (Minor Mineral) mining project" [Reference No.– 20221000050094, M.L.… — more information requested, 6.2 km away
- Reappraisal of the EC granted by DEIAA Ajmer for Quartz , Feldspar and Mica… — lapsed, 6.5 km away
- Shri Parasmal Dabriya, Granite Mine,ML No-100/1995 — environmental approval granted, 6.8 km away
- Shri Dalvir Chandna, Granite Mine, ML No. 283/1995 — environmental approval granted, 7.1 km away
- Shri Champa Lal Ji Sen (ML No. - 549/2005) — lapsed, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.