Quick answers
What is this project?
Proposed Forest Land for Diversion for "construction of Approach Gravel Road Village- Garinda to NH-52 – Beer Fatehpur, Village-Beer Fatehpur, Range – Fatehpur, Tehsil- Fatehpur, District- Sikar (Raj.) is a proposed road project in Fatehpur Bir, Fatehpur, Sikar, Rajasthan. The site covers 2 acres.
Who is building it?
The applicant is Bdo Fatehpur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Fatehpur Bir, Fatehpur, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹1 lakh; a site of 2 acres and 900 m² of forest land.
When was it filed?
The application was filed on 23 Jun 2026.
Project details
| Official title | Proposed Forest Land for Diversion for "construction of Approach Gravel Road Village- Garinda to NH-52 in Protected Forest Block – Beer Fatehpur, Village-Beer Fatehpur, Range – Fatehpur, Tehsil- Fatehpur, District- Sikar (Raj.) |
|---|---|
| Status | More information requested |
| Status since | 10 Nov 2026 |
| Application filed | 23 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bdo Fatehpur |
| Land area | 2 acres (0.8 ha) |
| Forest land | 900 m² |
| Project cost | ₹1 lakh |
| Village / locality | Fatehpur Bir |
| Taluk / tehsil | Fatehpur |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36765 |
In context
45 applications in Sikar since January 2022 are in the same category (Roads & highways): 6 approved, 13 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 2 acres, this one is smaller than 96% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fatehpur Bir, Fatehpur, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Upgradation of existing 2-L+P.S Carriageway to 4-L+P.S Carriageway… — lapsed, 1.6 km away
- Laying Underground Ofc Along Road Ch-0/0 (Dishnau) to 15 (NH Bikaner) =14.4 Km. — lapsed, 2.6 km away
- "Diversion of 150 ha. for Agricultural Research Center Fatehpur Shekhawati — lapsed, 2.7 km away
- Limited Height Subway in Lieu of Level Crossing -36 in Fps-Lnh Section — lapsed, 3.4 km away
- Lemited Height Subway in Lieu of Lc-36 in Fps-Lnh Section — lapsed, 3.4 km away
- "Construction of Approach Access for Indian Oil Corporation Limited Retail… — forest land use approved, 4 km away
- Shri Budhhgiri ji Madhi,Temple & Approach Road village Fatehpur distt- Sikar — lapsed, 5.3 km away
- Construction of Missing Link Road in Forest Block Udansari ,sikar — more information requested, 9.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.