Quick answers
What is Power Connection to Own Khatedari Land?
Power Connection to Own Khatedari Land is a proposed power project in Sagaron Ki Basti, Jaisalmer, Rajasthan. The site covers 0.2 acres.
Who is building it?
The applicant is Musa Khan.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Sagaron Ki Basti, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹2 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 27 Jul 2023.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 27 Jul 2023 |
| Application filed | 27 Jul 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Musa Khan |
| Land area | 1,000 m² |
| Project cost | ₹2 lakh |
| Village / locality | Sagaron Ki Basti |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36836 |
In context
13 applications in Jaisalmer since January 2022 are in the same category (Power): 0 approved, 11 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 83% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sagaron Ki Basti, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BSNL Rajasthan-District JAISALMER-Village-Menuon ki Basti-(646499)"in tehsil… — more information requested, 1.5 km away
- Power Connection to Own Khatedari Land — under wildlife review, 3.1 km away
- "Proposal for 11 KV Underground Electric Line for Agricultural Borewell… — under wildlife review, 3.3 km away
- Power Connection to Own Khatedari Land — more information requested, 3.5 km away
- Power Connection to Own Khatedari Land — more information requested, 4 km away
- Power Connection to Own Khatedari Land — decision issued, 4.5 km away
- Mission 500 (4g Saturation Project of Govt. of India) — application filed, 4.6 km away
- Power Connection to Own Khatedari Land — more information requested, 8.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.