What is Developing? Open the mapMap

Application filedPower · Barmer, Rajasthan

Power Connection to Own Khatedari Land

Power Connection to Own Khatedari Land is a proposed power project in Turbi, Gadraroad, Barmer, Rajasthan. Its stated project cost is ₹2 lakh. As of 27 Nov 2026, its status is “Application filed” (since 20 Mar 2023).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Power Connection to Own Khatedari Land?

Power Connection to Own Khatedari Land is a proposed power project in Turbi, Gadraroad, Barmer, Rajasthan.

Who is building it?

The applicant is Kasturba Kanwar.

Has it been approved?

Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.

Where is it?

In Turbi, Gadraroad, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹2 lakh.

When was it filed?

The application was filed on 20 Mar 2023.

Project details

StatusApplication filed
Status since20 Mar 2023
Application filed20 Mar 2023
Approval soughtWildlife review
Application typeNew project
SectorPower
ApplicantKasturba Kanwar
Project cost₹2 lakh
Village / localityTurbi
Taluk / tehsilGadraroad
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-37038

In context

24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval.

Where it is

Turbi, Gadraroad, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.