Quick answers
What is this project?
Wildlife Clearance for construction work of Sewage Treatment Plant (STP) in Municipality Rawatbhata, District- Chittorgarh (Rajasthan)" is a proposed waste management project in Rawatbhata, Chittaurgarh, Rajasthan. The site covers 1.5 acres.
Who is building it?
The applicant is Municipal Board Rawatbhata.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Rawatbhata, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹41.1 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 5 Jan 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Jan 2026 |
| Application filed | 5 Jan 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Waste management |
| Applicant | Municipal Board Rawatbhata |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹41.1 crore |
| Village / locality | Rawatbhata |
| Taluk / tehsil | Rawatbhata |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-37283 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rawatbhata, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sh-9a Km 65 to Saneeta — withdrawn, 2.2 km away
- Construction of 33kV Double Circuit Power Transmission Line — decision issued, 3.4 km away
- Construction of Approach Road Luhariya — under wildlife review, 4.3 km away
- "Laying Under Ground 11KV XLPE 185 Sq. mm Cable from Existing 11 kV line at… — under wildlife review, 5.4 km away
- 4g Saturation Project of Government of India for 4g Tower Installation Through… — decision issued, 5.7 km away
- Construction of road SH-9A KM 65 TO SANEETA — more information requested, 6.8 km away
- Governement of India Project for 4g Tower Installation Through Bsnl for This… — more information requested, 7.7 km away
- Mobile Tower installation by BSNL — lapsed, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.