| Status | Initial checks |
|---|---|
| Status since | 22 Nov 2026 |
| Application filed | 21 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahender Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Morthala |
| Taluk / tehsil | Abu Road |
| District | Sirohi |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-37487 |
In context
511 applications in Sirohi since January 2022 are in the same category (Mining): 274 approved, 42 filed or under review, and 195 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Morthala, Abu Road, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in production capacity from 50,050 TPA (ROM) to 1,48,850 TPA (ROM)… — lapsed, 0 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Sirohi [Rajasthan]… — environmental approval granted, 0 m away
- Proposed STP Masonry Stone Mining Project, Reference No.:- 202410000103403,… — environmental approval granted, 400 m away
- Re-Appraisal Of EC Granted From DEIAA Sirohi For Existing Marble Mining… — lapsed, 1.2 km away
- Reappraisal of the EC Granted By DEIAA Sirohi For Marble Mining Project ML No-… — lapsed, 1.5 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Delineated Plot… — cleared for impact study, 1.5 km away
- This is River Sand (Bajri) Mining Project (Minor Mineral), Delineated Plot… — cleared for impact study, 3.3 km away
- Diversion of 0.6180 hectare Forest land in favour of World Renewal Spiritual… — under wildlife review, 3.4 km away
More from Mahender Singh in Sirohi
- Expansion in production capacity from 50,050 TPA (ROM) to 1,48,850 TPA (ROM)… — lapsed