Quick answers
What is this project?
Proposed Masonry Stone (Crusher Gitti) Mining Project, ML. No. – 06/2024 (Reference No.- 202410000116012), Area- 2.2027 Ha., Near Village- Bassi, Fatehpura, Tehsil – Begun & District – Chittorgarh (Raj.) of M/s Swastik Crusher is a proposed mining project in Fatehpur, Begun, Chittaurgarh, Rajasthan. The site covers 5.4 acres.
Who is building it?
The applicant is Swastik Crusher.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Fatehpur, Begun, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹90 lakh and a site of 5.4 acres.
When was it filed?
The application was filed on 19 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 19 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Swastik Crusher |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Fatehpur |
| Taluk / tehsil | Begun |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-37534 |
In context
2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 5.4 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Fatehpur, Begun, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization and expansion of Industrial Shed for Nitin Spinners Limited — environmental approval granted, 2.3 km away
- Regularization and Expansion in the Industrial Shed For Nitin Spinners… — withdrawn, 2.3 km away
- Regularization and expansion of Industrial Shed for Nitin Spinners Limited — cleared for impact study, 2.3 km away
- Semaliya-II Off-Stream Closed Loop Pumped Storage Project — cleared for impact study, 3.4 km away
- Ramesh Singh Q.L 06 Umar Chittorgarh — lapsed, 4.4 km away
- Chandra kant Vyas Q.L 12 UMAR CHITTORGARH — lapsed, 4.4 km away
- Sanjay Kumar Sharma Q.L 22 Umar Chittorgarh — lapsed, 4.5 km away
- Sanjay Kumar Sharma Q.L 27 Umar Chittorgarh — lapsed, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.