Quick answers
What is this project?
Proposed roof-top Swimming Pool of "WEST POINT" - Integrated Commercial cum MLCP Complex is an approved commercial project in Assam, Gangtok, East District, Sikkim. The site covers 2.8 acres.
Who is building it?
The applicant is Mesaso Infrastructure PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2025), as of 27 Nov 2026.
Where is it?
In Assam, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹298.2 crore and a site of 2.8 acres.
When was it filed?
The application was filed on 24 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2025 |
| Application filed | 24 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Mesaso Infrastructure PVT. LTD. |
| Use | Commercial |
| Land area | 2.8 acres (1.1 ha) |
| Built-up area | 35,386 m² (3,80,891 sq ft) |
| Plot area | 5,666 m² (60,988 sq ft) |
| Project cost | ₹298.2 crore |
| Village / locality | Assam |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00010 |
In context
10 applications in East District since January 2022 are in the same category (Buildings & townships): 6 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.8 acres, this one is smaller than 70% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Assam, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Vertical Expansion by 3 Floors of "WEST POINT" - Integrated… — environmental approval granted, 0 m away
- New Road From Phewa Busty to Indira Bye Pass in Gangtok, Sikkim — more information requested, 550 m away
- Development of Residential Complex by Sm Infrastructure Private Limited — withdrawn, 850 m away
- Diversion of 0.9833 Ha of Forest Land for Development of Solid Waste… — forest land use approved, 1.3 km away
- Diversion of 0.0183 Ha of Forest Land for Const of Sewerage System for Zone… — forest land use approved, 1.5 km away
- Public Amenities in Existing View Point at Bulbuley, Gangtok, Sikkim — lapsed, 1.6 km away
- Tourist Infrastructure at Bulbuley, Gangtok T Range under Gangtok District by… — not approved, 1.6 km away
- Diversion of 0.03128 Ha of Forest Land for Augmentation of Water Supply System… — forest land use approved, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.