Quick answers
What is this project?
Diversion of Forest Land for Laying of Ofc Cable of Garn-9038 Connecting Through Forest Areas of Geyzing Forest Block, West Sikkim Dist for a Length of 1.5 Km is a lapsed telecom project in Gyalshing Forest Block, Gyalshing, West District, Sikkim. The site covers 0.1 acres.
Who is building it?
The applicant is Reliance Jio Infocomm Limited.
Has it been approved?
No. The application was lapsed on 20 May 2025, so it is no longer under consideration.
Where is it?
In Gyalshing Forest Block, Gyalshing, West District, Sikkim.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.1 acres and 600 m² of forest land.
When was it filed?
The application was filed on 23 May 2023.
Project details
| Official title | Proposal for Diversion of Forest Land for Laying of Ofc Cable of Garn-9038 Connecting Through Forest Areas of Geyzing Forest Block, West Sikkim Dist for a Length of 1.5 Km |
|---|---|
| Status | Lapsed |
| Status since | 20 May 2025 |
| Application filed | 23 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Limited |
| Land area | 600 m² |
| Forest land | 600 m² |
| Project cost | ₹2 lakh |
| Village / locality | Gyalshing Forest Block |
| Taluk / tehsil | Gyalshing |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00074 |
In context
10 applications in West District since January 2022 are in the same category (Telecom): 1 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gyalshing Forest Block, Gyalshing, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.15 Hac of forest land for construction of office complex or… — forest land use approved, 1.2 km away
- Laying Ofc From Gyalshing to Laso Passing Through Forest Areas of Gyalshing… — lapsed, 2.5 km away
- Diversion of 1.44 Ha of Forest Land for Const of Approach Road to Sewerage… — more information requested, 2.8 km away
- Laying Ofc From Laso to Gyalshing Forest Block Through Forest Areas Along the… — lapsed, 4.9 km away
- Rabindranath Tagore Park and Cultural Centre at Megi Dara, Rinchenpong, West… — not approved, 5.8 km away
- Rabindranath Park and Cultural centre at Megi Dara, Rinchenpong,West Sikkim — lapsed, 5.8 km away
- Rangit-II Hydro Electric Project — cleared for impact study, 5.9 km away
- Diversion of 0.354 Ha Forest Land for Construction of Road From Bermiok to… — in-principle approval, conditions pending, 6.3 km away
More from Reliance Jio Infocomm Limited in West District
- Laying Ofc From Laso to Gyalshing Forest Block Through Forest Areas Along the… — lapsed
- Laying Ofc From Gyalshing to Laso Passing Through Forest Areas of Gyalshing… — lapsed
- LAYING OFC FROM BAIGUNEY TO KALUK PASSING THROGH SISNEY RESERVE FOREST AREA OF… — forest land use approved
- Diversion of 0.544 Ha of Forest Land for Laying of Ofc Cable of Zoom 2… — lapsed
- LAYING OFC FROM BAIGUNEY TO KALUK PASSING THROGH SISNEY RESERVE FOREST AREA OF… — lapsed
- Diversion of Forest Land for Laying of Ofc Cable of Zoom 2 Connecting Through… — lapsed
10 Reliance Jio Infocomm (Jio) projects in West District
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.