What is Developing? Open the mapMap

Forest land use approvedOther · South District, Sikkim

Diversion of 1.8115 ha of Forest Land for Muck Dumping at Thalthaley, Pamphok for Teesta-VI HE Project (500 MW)

Diversion of 1.8115 ha of Forest Land for Muck Dumping at Thalthaley, Pamphok for Teesta-VI HE Project (500 MW) is an approved project in Pamphok, Namchi, South District, Sikkim. The site covers 4.5 acres. Its stated project cost is ₹5.6 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 20 Apr 2026).

See it on the live map All projects in South District

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since20 Apr 2026
Application filed1 Jan 2024
Approval soughtForest land use
Application typeNew project
SectorOther
ApplicantLanco Teesta Hydro Power Limited
Land area4.5 acres (1.8 ha)
Forest land4.5 acres (1.8 ha)
Project cost₹5.6 crore
Village / localityPamphok
Taluk / tehsilNamchi
DistrictSouth District
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00155

In context

7 applications in South District since January 2022 are in the same category (Other): 3 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pamphok, Namchi, South District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lanco Teesta Hydro Power Limited in South District

4 Lanco Teesta Hydro Power projects in South District
All 5 Lanco Teesta Hydro Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.