What is Developing? Open the mapMap

Forest land use approvedWater & irrigation · Other, Sikkim

Diversion of 1.2721 Ha of Forest Land for Construction of Silt Flushing Tunnel of Rangit IV Hep at Reshi, Soreng District West Sikkim by Jal Power Co LTD

Diversion of 1.2721 Ha of Forest Land for Construction of Silt Flushing Tunnel of Rangit IV Hep at Reshi, Soreng District West Sikkim by Jal Power Co LTD is an approved water and irrigation project in Other, Sikkim. The site covers 3.1 acres. Its stated project cost is ₹1 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 15 Jun 2024).

See it on the live map All projects in Other

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since15 Jun 2024
Application filed30 Jan 2023
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantJalpower Corporation Limited
Land area3.1 acres (1.3 ha)
Forest land3.1 acres (1.3 ha)
Project cost₹1 lakh
DistrictOther
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00188

Where it is

Other, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.