Quick answers
What is this project?
Multimodal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border is a proposed project in Maneybung, Gyalshing, West District, Sikkim. The site covers 29.7 acres.
Who is building it?
The applicant is Multi modal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Maneybung, Gyalshing, West District, Sikkim.
How big is it?
It has a stated cost of ₹5 crore and a site of 29.7 acres.
When was it filed?
The application was filed on 24 Feb 2026.
Project details
| Official title | Establishment of Multimodal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border |
|---|---|
| Status | Under wildlife review |
| Status since | 24 Feb 2026 |
| Application filed | 24 Feb 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Multi modal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹5 crore |
| Village / locality | Maneybung |
| Taluk / tehsil | Gyalshing |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00281 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Feb 2026 (this page) | Under wildlife review | 29.7 acres | ₹5 crore |
| New project filed 17 Feb 2026 | More information requested | 29.7 acres | ₹5 crore |
In context
21 applications in West District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 29.7 acres, this one is larger than 80% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maneybung, Gyalshing, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Multi Modal Corridor at Chewa Bhanjyang, Sikkim-Nepal Border — application filed, 0 m away
- Multi Modal Corridor at Chewa Bhanjyang, Sikkim-Nepal Border — lapsed, 0 m away
- Multimodal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border — more information requested, 0 m away
- Multi modal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border — initial checks, 250 m away
- Border Out Post of 36th Bn Ssb (Mha) at Chewabhanjang (West Sikkim ) ,sikkim — under wildlife review, 300 m away
- Diversion of Forest Land for Construction of 11 KV Transmission Line and… — decision issued, 300 m away
- Drawing of 11 Kv Transmission line and installation of distribution… — more information requested, 300 m away
- Border Out Post of 36 Bn SSB Geyzing at Chittarey (West Sikkim), Sikkim — under wildlife review, 950 m away
More from Multi modal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border in West District
- Multi modal corridor/ICP at Chewa Bhanjyang, Sikkim-Nepal Border — initial checks
- Multi Modal Corridor at Chewa Bhanjyang, Sikkim-Nepal Border — application filed
- Multi Modal Corridor at Chewa Bhanjyang, Sikkim-Nepal Border — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.