Quick answers
What is Mining project by M/s. Rock More Aggregates?
This proposed mining project by M/s. Rock More Aggregates is in Sirigiripalli, Gajwel, Siddipet, Telangana. The site covers 10 acres.
Who is building it?
The applicant is Rockmore Aggregates.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Sirigiripalli, Gajwel, Siddipet, Telangana.
How big is it?
It has a stated cost of ₹50 lakh and a site of 10 acres.
When was it filed?
The application was filed on 23 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rockmore Aggregates |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Sirigiripalli |
| Taluk / tehsil | Gajwel |
| District | Siddipet |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00026 |
In context
27 applications in Siddipet since January 2022 are in the same category (Mining): 21 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10 acres, this one is larger than 70% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sirigiripalli, Gajwel, Siddipet, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/S KDA Ispat Private Limited — environmental approval granted, 3.6 km away
- Industrial project by M/S KDA Ispat Private Limited — cleared for impact study, 3.6 km away
- Diversion of 0.0781 Ha of Forest Land to Maharashtra Natural Gas Limited… — forest land use approved, 6.5 km away
- 2.30 Ha. Rough Stone and Road Metal quarry of Sy.No.272, Itikyala Village,… — environmental approval granted, 9.8 km away
- Assistant Director of Mines & Geology Siddipet - 2.3 Ha., — environmental approval granted, 9.8 km away
- Mining project by M/s J.V.S. Constructions — environmental approval granted, 9.9 km away
- Diversion of Forest Land to an Extent of 0.2355 Ha. in Narsampally and Gajwel… — forest land use approved, 10.1 km away
- Laying of Ug Steel Gas Pipeline for the Supply of Piped Natural Gas With in… — approval revoked, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.