Quick answers
What is this project?
Road Metal and Building stone mining - 6.52 ha by Sri Venkata Shiva Metal Industries is an approved mining project in Deshmukh, B Pochampally, Yadadri Bhuvanagiri, Telangana. The site covers 16.1 acres.
Who is building it?
The applicant is Guduru Narender Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Nov 2022), as of 27 Nov 2026.
Where is it?
In Deshmukh, B Pochampally, Yadadri Bhuvanagiri, Telangana.
How big is it?
It has a stated cost of ₹40 lakh and a site of 16.1 acres.
When was it filed?
The application was filed on 15 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Nov 2022 |
| Application filed | 15 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Guduru Narender Reddy |
| Land area | 16.1 acres (6.5 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Deshmukh |
| Taluk / tehsil | B Pochampally |
| District | Yadadri Bhuvanagiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00034 |
In context
63 applications in Yadadri Bhuvanagiri since January 2022 are in the same category (Mining): 52 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.1 acres, this one is larger than 81% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 42.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Deshmukh, B Pochampally, Yadadri Bhuvanagiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Sai Vikas Stone Crushing Industries — environmental approval granted, 350 m away
- Mining project by M/s. Alluri Estates Pvt Ltd — cleared for impact study, 450 m away
- Proposed Semi Mechanised Opencast Quarrying for the Extraction of Building… — environmental approval granted, 1000 m away
- 4.0 Ha. Rough Stone & Road Metal quarry of Sy.No.438 (Govt land), Pillaipally… — environmental approval granted, 2 km away
- Sri N Penchal Naidu — environmental approval granted, 2 km away
- Mining project by M/s. V.K.A Constructions — under environmental review, 2 km away
- M/s B. Seenaiah and Company Project Ltd — initial checks, 2.1 km away
- Mining project by M/s. GMR Stone Crusher — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.