Quick answers
What is this project?
Proposed Expansion of Existing Grain Based Distillery from 150 KLPD (150 KL x 365 days = 54,750 KLPA) to 180 KLPD (180 KL x 365 days = 65,700 KLPA) by M/s. Allied Blenders and Distillers Private Limited is an approved industrial project in Rangapur, Pebbair, Wanaparthy, Telangana. The site covers 30 acres.
Who is building it?
The applicant is M/S Allied Blenders and Distillers PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Oct 2022), as of 27 Nov 2026.
Where is it?
In Rangapur, Pebbair, Wanaparthy, Telangana.
How big is it?
It has a stated cost of ₹302.6 crore and a site of 30 acres.
When was it filed?
The application was filed on 18 Oct 2022.
Project details
| Official title | Proposed Expansion of Existing Grain Based Distillery from 150 KLPD (150 KL x 365 days = 54,750 KLPA) to 180 KLPD (180 KL x 365 days = 65,700 KLPA) along with existing 6.5 MW Power Plant by M/s. Allied Blenders and Distillers Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Oct 2022 |
| Application filed | 18 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S Allied Blenders and Distillers PVT. LTD. |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹302.6 crore |
| Village / locality | Rangapur |
| Taluk / tehsil | Pebbair |
| District | Wanaparthy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00166 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rangapur, Pebbair, Wanaparthy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Grain Based Distillery of 180 KLPD (180 KL x 365 days = 65,700 KLPA)… — environmental approval granted, 0 m away
- Existing Grain Based Distillery of 180 KLPD (180 KL x 365 days = 65,700 KLPA)… — cleared for impact study, 0 m away
- Mining project by M/s MRGR Constructions — under environmental review, 10 km away
- Sri A.Seshagiri Rao — environmental approval granted, 10.2 km away
- Sri A.Seshagiri Rao — environmental approval granted, 10.2 km away
- Earth Work Excavation and Construction of Cm and Cd Works From Km 0.000 to Km… — under forest review, 16.2 km away
- Sri Vavilala Rajeshwar Reddy — environmental approval granted, 16.9 km away
- Diversion of 0.1485 Ha for setup for Bus Shelter, Water Tank and Mini… — lapsed, 17.3 km away
3 Allied Blenders and projects in Wanaparthy
All 4 Allied Blenders and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.