Cleared for impact studyIndustry · Nalgonda, Telangana

Expansion of Steel Plant - DRI Kilns Sponge Iron from 60,000 TPA to 1,26,000 TPA, WHRB(DRI) based Power Plant from 5 MW to 10 MW, establishment of Induction Furnaces with LRF &CCM (Hot Billets / Billets / Ingots) - 3,56,000 TPA, Rolling Mills (Hot Strip Mill)(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel)- 3,50,000 TPA, Pipe Mill – 2,90,000 TPA, Cold Rolling Mill – 2,60,000 TPA, GP Line Mill – 2,60,000 TPA, Hot Dip Galvanizing unit (50,000 TPA), Ferro Alloys -

Expansion of Steel Plant - DRI Kilns Sponge Iron from 60,000 TPA to 1,26,000 TPA, WHRB(DRI) based Power Plant from 5 MW to 10 MW, establishment of Induction Furnaces with LRF &CCM (Hot Billets / Billets / Ingots) - 3,56,000 TPA, Rolling Mills (Hot Strip Mill)(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel)- 3,50,000 TPA, Pipe Mill – 2,90,000 TPA, Cold Rolling Mill – 2,60,000 TPA, GP Line Mill – 2,60,000 TPA, Hot Dip Galvanizing unit (50,000 TPA), Ferro Alloys - is a proposed industrial project in Veliminedu, Chityal, Nalgonda, Telangana. The site covers 31 acres. Its stated project cost is ₹508.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Jun 2023).

See it on the live map All projects in Nalgonda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since3 Jun 2023
Application filed3 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMpl Steel Industries Private Limited
Land area31 acres (12.5 ha)
Project cost₹508.9 crore
Village / localityVeliminedu
Taluk / tehsilChityal
DistrictNalgonda
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-00170

In context

23 applications in Nalgonda since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 31 acres, this one is larger than 65% of them.

20 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Veliminedu, Chityal, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mpl Steel Industries Private Limited in Nalgonda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.