Environmental approval grantedIndustry · Suryapet, Telangana

Proposed 150 KLPD Grain based Distillery (Ethanol) with 3.2 MW Cogeneration Power Plant at S.No. 128, 130 & 132, Ravipahad Village, Mothey Mandal, Suryapeth District, Telangana State - 508213 by M/s NMK Biofuels Pvt Ltd.

Proposed 150 KLPD Grain based Distillery (Ethanol) with 3.2 MW Cogeneration Power Plant at S.No. 128, 130 & 132, Ravipahad Village, Mothey Mandal, Suryapeth District, Telangana State - 508213 by M/s NMK Biofuels Pvt Ltd is an approved industrial project in Raavi Pahad, Mothey, Suryapet, Telangana. The site covers 15.7 acres. Its stated project cost is ₹170 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Nov 2022).

See it on the live map All projects in Suryapet

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 150 KLPD Grain based Distillery (Ethanol) with 3.2 MW Cogeneration Power Plant at S.No. 128, 130 & 132, Ravipahad Village, Mothey Mandal, Suryapeth District, Telangana State - 508213 by M/s NMK Biofuels Pvt Ltd is an approved industrial project in Raavi Pahad, Mothey, Suryapet, Telangana. The site covers 15.7 acres.

Who is building it?

The applicant is Nmk Biofuels Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 7 Nov 2022), as of 27 Nov 2026.

Where is it?

In Raavi Pahad, Mothey, Suryapet, Telangana.

How big is it?

It has a stated cost of ₹170 crore and a site of 15.7 acres.

When was it filed?

The application was filed on 7 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since7 Nov 2022
Application filed7 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantNmk Biofuels Private Limited
Land area15.7 acres (6.4 ha)
Project cost₹170 crore
Village / localityRaavi Pahad
Taluk / tehsilMothey
DistrictSuryapet
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-00189

In context

16 applications in Suryapet since January 2022 are in the same category (Industry): 8 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 15.7 acres, this one is smaller than 62% of them.

Where it is

Raavi Pahad, Mothey, Suryapet, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.