Quick answers
What is Building project by M/s. Dilpreet Tubes Pvt. Ltd.?
This approved building project by M/s. Dilpreet Tubes Pvt. Ltd. is in Nacharam, Uppal, Medchal Malkajgiri, Telangana. The site covers 4 acres.
Who is building it?
The applicant is Dilpreet Tubes Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 May 2023), as of 27 Nov 2026.
Where is it?
In Nacharam, Uppal, Medchal Malkajgiri, Telangana.
How big is it?
It has a stated cost of ₹87.3 crore and a site of 4 acres.
When was it filed?
The application was filed on 1 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building project by M/s. Dilpreet Tubes Pvt. Ltd.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 May 2023 |
| Application filed | 1 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dilpreet Tubes Private Limited |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹87.3 crore |
| Village / locality | Nacharam |
| Taluk / tehsil | Uppal |
| District | Medchal Malkajgiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00284 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Sept 2024 | Environmental approval granted | 4 acres | ₹87 crore |
| New project filed 1 May 2023 (this page) | Environmental approval granted | 4 acres | ₹87.3 crore |
In context
394 applications in Medchal Malkajgiri since January 2022 are in the same category (Buildings & townships): 300 approved, 54 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 64% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nacharam, Uppal, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. Dilpreet Tubes Pvt. Ltd. — environmental approval granted, 0 m away
- Residential Apartments Construction Project at Survey Nos. 617/11 and 617/12,… — environmental approval granted, 350 m away
- Residential Apartments Construction Project at Survey Nos. 617/11 and 617/12,… — cleared for impact study, 350 m away
- Industrial project by Cohance Lifesciences Limited — environmental approval granted, 800 m away
- Proposed Change in Product Mix with No Increase In Pollution Load (NIPL) in… — initial checks, 1.2 km away
- Proposed expansion of existing Drug Intermediate manufacturing unit to Bulk… — environmental approval granted, 1.3 km away
- Proposed expansion of existing Drug Intermediate manufacturing unit to Bulk… — cleared for impact study, 1.3 km away
- Commercial Building Project by Retail Infra Projects — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.