One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of MS Billets from 27000 TPA to 100000 TPA and inclusion of rolling mill…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 May 2023 |
| Application filed | 4 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ansh Ispat LLP |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹51 crore |
| Village / locality | Kamaram |
| Taluk / tehsil | Shankarampet (R) |
| District | Medak |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00348 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Apr 2024 | Environmental approval granted | 4 acres | ₹51 crore |
| Early planning filed 4 May 2023 (this page) | Cleared for impact study | 4 acres | ₹51 crore |
In context
28 applications in Medak since January 2022 are in the same category (Industry): 20 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 89% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamaram, Shankarampet (R), Medak, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of MS Billets from 27000 TPA to 100000 TPA and inclusion of rolling… — environmental approval granted, 0 m away
- Regularization of existing rolling mill for manufacturing of MS Sections,… — environmental approval granted, 150 m away
- Regularization of existing rolling mill for manufacturing of MS Sections,… — cleared for impact study, 150 m away
- Regularization of existing Mild Steel Re-Rolling mill for manufacturing of MS… — environmental approval granted, 850 m away
- Regularization of existing Mild Steel Re-Rolling mill for manufacturing of MS… — cleared for impact study, 850 m away
- Industrial project by M/s Radha Smelters Private Limited — environmental approval granted, 1.5 km away
- Industrial project by M/s Radha Smelters Private Limited — environmental approval granted, 1.5 km away
- Industrial project by M/s Radha Smelters Private Limited — cleared for impact study, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.