Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Mar 2023 |
| Application filed | 25 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Arbern Infratech |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹53 crore |
| Village / locality | Pashamylaram |
| Taluk / tehsil | Patancheru |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00373 |
In context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 82% of them.
86 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pashamylaram, Patancheru, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Matrix Pharmacorp Private Limited, Unit - 7 — environmental approval granted, 600 m away
- Project by M/s. Tianish Laboratories Private Limited unit-7 (Formerly known as… — initial checks, 600 m away
- Industrial project by M/s Tianish Laboratories Private Limited, unit 7 — environmental approval granted, 600 m away
- Mylan Laboratories Limited, Unit -7 — withdrawn, 600 m away
- Submission of No Increase in Pollution Load for the proposed Change of Product… — initial checks, 800 m away
- Industrial project by M/s. Sreeni Labs Private Limited — environmental approval granted, 1 km away
- Request to change the name of company in existing Environmental Clearance for… — returned to applicant, 1.1 km away
- Request to change the name of company in existing Environmental Clearance for… — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.