Quick answers
What is Grain Based Distillery Project of 120 Klpd?
Grain Based Distillery Project of 120 Klpd is a proposed industrial project in Koppula, Shayampet, Hanumakonda, Telangana. The site covers 20 acres.
Who is building it?
The applicant is Orugallu Biofuel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Koppula, Shayampet, Hanumakonda, Telangana.
How big is it?
It has a stated cost of ₹160 crore and a site of 20 acres.
When was it filed?
The application was filed on 23 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Grain Based Distillery Project of 120 Klpd
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Orugallu Biofuel Private Limited |
| Land area | 20 acres (8.1 ha) |
| Project cost | ₹160 crore |
| Village / locality | Koppula |
| Taluk / tehsil | Shayampet |
| District | Hanumakonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00378 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 20 acres | ₹160 crore |
| New project filed 21 Jul 2023 | Environmental approval granted | 20 acres | ₹160 crore |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koppula, Shayampet, Hanumakonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grain Based Distillery Project of 120 Klpd — environmental approval granted, 0 m away
- Mining project by M/s. Sri Sai Venkateshwara Stone Crusher — environmental approval granted, 700 m away
- Sri V. Rama Rao — lapsed, 850 m away
- Quarry Lease Area of 7.50 hectares of KSP Mines and Minerals — environmental approval granted, 1.3 km away
- Quarry Lease area over an extent of 2.40 hectares in Sy. Nos. 387/1 — environmental approval granted, 1.4 km away
- Proposed Building Stone & Road Metal Quarry of M/s Sri Sai Ram Stone Crusher — environmental approval granted, 3 km away
- Semi Mechanized Opencast Mining Method for Road Metal and Building Stone… — environmental approval granted, 3.1 km away
- Proposed to Conduct Semi Mechanized Opencast Mining Method for Building Stone… — lapsed, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.