Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 May 2023 |
| Application filed | 14 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Dhanlaxmi Iron Industries Private Limited |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹22.8 crore |
| Village / locality | Bontapalli |
| Taluk / tehsil | Gummadidala |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00443 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 5.4 acres | ₹22.8 crore |
| New project filed 14 May 2023 (this page) | Environmental approval granted | 5.4 acres | ₹22.8 crore |
In context
85 applications in Sangareddy since January 2022 are in the same category (Industry): 55 approved, 18 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 5.4 acres, this one is smaller than 71% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bontapalli, Gummadidala, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rolling mill for manufacturing of M.S. CTD Bars/TMT Bars/ M.S. Rounds of… — cleared for impact study, 0 m away
- Submission of Transfer of Environmental Clearance (EC) from Symed Labs… — environmental approval granted, 300 m away
- Symed Labs Limited, Unit-1 — initial checks, 300 m away
- Proposed change of product mix for Hetero Drugs Limited Unit I, located at Sy.… — initial checks, 550 m away
- Project by M/s. Clariant India Private Limited. (Formerly M/s. Clariant India… — initial checks, 600 m away
- Change of Product Mix on the Basis of No Increase in Pollution Loads and… — initial checks, 600 m away
- Amendment in existing EC for inclusion of additional standby DG sets to… — environmental approval granted, 1 km away
- Amendment in existing Environmental Clearance (EC) for addition of land and… — environmental approval granted, 1 km away
All 4 Dhanlaxmi Iron Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.