Quick answers
What is Rajapushpa Warehouse by M/s Rajapushpa Asset Management LLP?
Rajapushpa Warehouse by M/s Rajapushpa Asset Management LLP is a proposed building project in Banda Mailaram, Mulug, Siddipet, Telangana. The site covers 126 acres.
Who is building it?
The applicant is Rajapushpa Asset Management LLP.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Jun 2023), as of 27 Nov 2026.
Where is it?
In Banda Mailaram, Mulug, Siddipet, Telangana.
How big is it?
It has a stated cost of ₹130 crore and a site of 126 acres.
When was it filed?
The application was filed on 29 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Rajapushpa Warehouse by M/s Rajapushpa Asset Management LLP
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Jun 2023 |
| Application filed | 29 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Rajapushpa Asset Management LLP |
| Land area | 126 acres (51 ha) |
| Project cost | ₹130 crore |
| Village / locality | Banda Mailaram |
| Taluk / tehsil | Mulug |
| District | Siddipet |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00539 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jul 2023 | Environmental approval granted | 126 acres | ₹130 crore |
| Early planning filed 29 Jun 2023 (this page) | Cleared for impact study | 126 acres | ₹130 crore |
In context
7 applications in Siddipet since January 2022 are in the same category (Buildings & townships): 5 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banda Mailaram, Mulug, Siddipet, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rajapushpa Warehouse by M/s Rajapushpa Asset Management LLP — environmental approval granted, 0 m away
- Industrial Warehouse by M/s. Truvic Projects Private Limited — under environmental review, 750 m away
- Sri. Mohammed Salim Abdul Rahim Khan, 3.0 Ha, Building Stone and Road metal… — environmental approval granted, 5.2 km away
- Mining project by M/s. GMR Rock Sand — environmental approval granted, 5.4 km away
- Diversion of Forest Land in Dasarlapalli RF of Siddipet Forest Division of… — lapsed, 5.9 km away
- Godavari Drinking Water Supply Scheme Phase II & III, Hmwssbh — lapsed, 6.4 km away
- Diversion of 0.2784 Ha Forest Land Passing Through Lalgadimalakpet, Zapti… — forest land use approved, 10.5 km away
- Diversion of 1.1668 Ha (1.3217 Ha) of Forest Land in Siddipet Division for… — more information requested, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.