What is Developing? Open the mapMap

Cleared for impact studyMining · Mancherial, Telangana

Devapur Limestone Mine-II (Area: 588.26 Ha) with Proposed Limestone Production Capacity: 9.06 Million TPA, Top Soil: 0.03 Million TPA, Over Burden: 1.19 Million TPA, Mineral Reject: 1.65 Million TPA (Total Excavation: 11.93 Million TPA)

Devapur Limestone Mine-II (Area: 588.26 Ha) with Proposed Limestone Production Capacity: 9.06 Million TPA, Top Soil: 0.03 Million TPA, Over Burden: 1.19 Million TPA, Mineral Reject: 1.65 Million TPA (Total Excavation: 11.93 Million TPA) is a proposed mining project in Gatrapalli, Kasipet, Mancherial, Telangana. The site covers 1,453.6 acres. Its stated project cost is ₹208.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 May 2026).

See it on the live map All projects in Mancherial

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleDevapur Limestone Mine-II (Area: 588.26 Ha) with Proposed Limestone Production Capacity: 9.06 Million TPA, Top Soil: 0.03 Million TPA, Over Burden: 1.19 Million TPA, Mineral Reject: 1.65 Million TPA (Total Excavation: 11.93 Million TPA) along with installation of 2 Crushers 1 x 1500 TPH & 1 x 1100 TPH located at Villages: Devapur & Gatrapalli, Tehsil: Kasipet, District: Mancherial, State: Telangana.
StatusCleared for impact study
Status since2 May 2026
Application filed9 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantTelangana State Mineral Development Corporation Limited
Land area1,453.6 acres (588.3 ha)
Project cost₹208.2 crore
Village / localityGatrapalli
Taluk / tehsilKasipet
DistrictMancherial
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-00545

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Feb 2026Lapsed1,453.6 acres₹208.2 crore
Early planning filed 9 May 2023 (this page)Cleared for impact study1,453.6 acres₹208.2 crore

In context

37 applications in Mancherial since January 2022 are in the same category (Mining): 23 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 1,453.6 acres, this one is larger than 70% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Gatrapalli, Kasipet, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Telangana State Mineral Development Corporation Limited in Mancherial

11 Telangana State Mineral Development Corporation projects in Mancherial
All 12 Telangana State Mineral Development Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.