Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Mar 2023 |
| Application filed | 7 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Janampet Gafoor |
| Land area | 5 acres (2 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Malkapur |
| Taluk / tehsil | Tandur |
| District | Vikarabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00671 |
In context
146 applications in Vikarabad since January 2022 are in the same category (Mining): 112 approved, 10 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Malkapur, Tandur, Vikarabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Jattur Nagaiah — environmental approval granted, 1 km away
- Sri Kurva Jagappa — environmental approval granted, 1.1 km away
- Smt. Zaibunnisa Begum — lapsed, 1.2 km away
- Industrial project by M/s. THE INDIA CEMENTS LIMITED — initial checks, 1.6 km away
- Limestone Slabs Quarry of Smt. B. Sadhana Reddy — lapsed, 2.3 km away
- Limestone Slabs Quarry of Smt B. Uma Maheshwari — lapsed, 2.4 km away
- Limestone Slabs Quarry of By Sri N. Raja Gopal Reddy — lapsed, 2.5 km away
- Limestone Slabs Quarry of By Smt Ratnamala Veerelli — lapsed, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.