Quick answers
What is this project?
Sri B. Nanda Reddy - Building Stone, Road Metal and Rough Stone Extraction of Semi Mechanized Opencast Mining Method in an Area of 4.570 Ha With Production of 162250 M3/Annum is an approved mining project in Taramatipet, Abdullapurmet, Ranga Reddy, Telangana. The site covers 11.3 acres.
Who is building it?
The applicant is Reddy Nanda.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Mar 2023), as of 27 Nov 2026.
Where is it?
In Taramatipet, Abdullapurmet, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹30 lakh and a site of 11.3 acres.
When was it filed?
The application was filed on 4 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Mar 2023 |
| Application filed | 4 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Reddy Nanda |
| Land area | 11.3 acres (4.6 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Taramatipet |
| Taluk / tehsil | Abdullapurmet |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00703 |
In context
99 applications in Ranga Reddy since January 2022 are in the same category (Mining): 82 approved, 6 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.3 acres, this one is larger than 60% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 110.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Taramatipet, Abdullapurmet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment for existing Environmental clearance order i.e., proposed to… — environmental approval granted, 0 m away
- Proposed to Expansion of Semi Mechanised Opencast Quarrying Operations for the… — environmental approval granted, 0 m away
- Telangana State Mineral Development Corporation Limited — environmental approval granted, 250 m away
- Proposed Stone & Metal Quarry Area of Ac.33.21½ of M/s. TSMDC Ltd at Sy.No:… — returned to applicant, 400 m away
- Proposed Stone & Metal Quarry Area of Ac.33.21½ of M/s. TGMDC Ltd at Sy.No:… — lapsed, 400 m away
- Proposed Stone & Metal Quarry Area of Ac.33.21½ of M/s. TGMDC Ltd at Sy.No:… — cleared for impact study, 400 m away
- Sri K. Krishna Reddy - 10.117 ha (25.00 Acres) -Stone and metal, and Gravel… — environmental approval granted, 1.3 km away
- Sri Guntupalli China Malakondaiah — environmental approval granted, 1.5 km away
More from Reddy Nanda in Ranga Reddy
- Amendment for existing Environmental clearance order i.e., proposed to… — environmental approval granted
- Proposed to Expansion of Semi Mechanised Opencast Quarrying Operations for the… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.