Quick answers
What is this project?
River Sand Mining Project for mining of ordinary sand in Godavari river basin at Subramanya Colony Reach, Ramachandrapuram (V), Venkatapuram Mandal, Mulugu District, Telangana is an approved mining project in Ippagudem [G], Venkatapuram, Mulugu, Telangana. The site covers 12.3 acres.
Who is building it?
The applicant is M/S Tsmdc LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 May 2023), as of 27 Nov 2026.
Where is it?
In Ippagudem [G], Venkatapuram, Mulugu, Telangana.
How big is it?
It has a stated cost of ₹25 lakh and a site of 12.3 acres.
When was it filed?
The application was filed on 26 May 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 May 2023 |
| Application filed | 26 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Tsmdc LTD |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Ippagudem [G] |
| Taluk / tehsil | Venkatapuram |
| District | Mulugu |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00782 |
In context
102 applications in Mulugu since January 2022 are in the same category (Mining): 94 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.3 acres, this one is smaller than 84% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 85 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 32 mining leases have applied within 5 km.
Where it is
Ippagudem [G], Venkatapuram, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed ordinary sand reach of Subramanya Colony Sand Reach over an extent of… — lapsed, 0 m away
- Proposed Ordinary Sand Mining of Ramachandrapuram-V Sand Reach over an extent… — environmental approval granted, 200 m away
- Proposed sand mining over an extent of 19.44 Hectares in Godavari River,… — cleared for impact study, 200 m away
- Proposed Sand mine in Godavari River Ramachandrapuram-IV Reach, over an extent… — environmental approval granted, 400 m away
- M/s.TSMDC Ltd Proposed ordinary sand lease (Ramachandrapuram-III) over an… — environmental approval granted, 1.1 km away
- Proposed ordinary sand lease over an extent of 4.99 Hectares on Godavari River… — environmental approval granted, 1.2 km away
- Proposed sand mining over an extent of 19.95 Hectares in Godavari River,… — cleared for impact study, 1.3 km away
- Ordinary sand open excavation of Morravanigudem-II Sand Reach over an extent… — environmental approval granted, 1.5 km away
All 6 Tsmdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.