Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | R.M.N Infrastructures Limited |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Gatlingampalli |
| Taluk / tehsil | Manoor |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01102 |
In context
127 applications in Sangareddy since January 2022 are in the same category (Mining): 90 approved, 19 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 59% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 19.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Gatlingampalli, Manoor, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. RMN Infrastructures Limited — environmental approval granted, 50 m away
- Diversion of 0.2606 Ha of Forest Land and 0.4956 Ha of Non Forest Land for… — more information requested, 1.8 km away
- Laying of Optical Fibre Cable between Naryankhed-Bibipet-Sultanabad,… — forest land use approved, 11.2 km away
- Laying of Optical Fibre Cable between Naryankhed-Bibipet-Sultanabad,… — lapsed, 11.2 km away
- Ethanol Plant of 100 Klpd Capacity With C & B Heavy Molasses As Feed Stock… — under environmental review, 13 km away
- Greenfield 1 x 120 KLPD Grain based Ethanol Plant / 1 x 160 KLPD Cane juice… — lapsed, 13 km away
- Quarry Lease Area Over an Extent of 1.323 Hects of Madam Shiva Ramulu — environmental approval granted, 13.6 km away
- GAMYA by M/s. Supadha Developers Private Limited — environmental approval granted, 13.7 km away
More from R.M.N Infrastructures Limited in Sangareddy
- Mining project by M/s. RMN Infrastructures Limited — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.