Quick answers
What is this project?
Four laning of NH-163 from Hyderabad [ORR near Appa Junction at design Km.14+000 (existing Km.14+000)] to Manneguda [design Km.60+405 (existing Km.59+500)] in the State of Telangana under NH(O) on Hybrid Annuity Mode is a proposed road project in Aloor Iii, Chevella, Ranga Reddy, Telangana. The site covers 636.1 acres.
Who is building it?
The applicant is Piu Hyderabad.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Feb 2024), as of 27 Nov 2026.
Where is it?
In Aloor Iii, Chevella, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹928.4 crore and a site of 636.1 acres.
When was it filed?
The application was filed on 2 Jan 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Feb 2024 |
| Application filed | 2 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | Piu Hyderabad |
| Land area | 636.1 acres (257.4 ha) |
| Project cost | ₹928.4 crore |
| Village / locality | Aloor Iii |
| Taluk / tehsil | Chevella |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01158 |
In context
20 applications in Ranga Reddy since January 2022 are in the same category (Roads & highways): 2 approved, 6 filed or under review, and 12 withdrawn, lapsed or rejected. At 636.1 acres, this one is larger than 95% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aloor Iii, Chevella, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Optical Fibre Cable Between Chevella to Mrugavani National Park… — lapsed, 1.8 km away
- Diversion of Forest Land in Mudimiyal Reserve Forest, Chilkur Range,… — under forest review, 1.8 km away
- Diversion of 0.1708 Ha of Forest Land in Sy. No. 301, 302 in Mudimiyal RF of… — not approved, 1.8 km away
- Building project by M/s Korupolu Vijaya Bhaskar Reddy & others proposes — environmental approval granted, 2.9 km away
- Residential construction project located at Survey Nos. 683/p, 685/p, 686/p,… — environmental approval granted, 2.9 km away
- Residential Villas construction project located at Survey Nos. 677/p, 678,… — environmental approval granted, 3.2 km away
- Residential Villas construction project located at Survey Nos. 677/p, 678,… — cleared for impact study, 3.2 km away
- Lansum Evana by M/s. Lansum Properties LLP — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.