| Status | Environmental approval granted |
|---|---|
| Status since | 5 Jun 2025 |
| Application filed | 29 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tripura Constructions |
| Use | Residential |
| Units | 1,088 |
| Towers | 13 |
| Floors (tallest) | 9 |
| Basements | 2 |
| Parking spaces | 1,632 |
| Land area | 11.8 acres (4.8 ha) |
| Built-up area | 2,64,904 m² (28,51,400 sq ft) |
| Plot area | 47,677 m² (5,13,190 sq ft) |
| Project cost | ₹390 crore |
| Village / locality | Tellapuram |
| Taluk / tehsil | Ramchandrapuram |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01426 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Apr 2025 (this page) | Environmental approval granted | 11.8 acres | ₹390 crore |
| Early planning filed 28 Jun 2024 | Cleared for impact study | 11.8 acres | ₹390 crore |
What the filings say
What is planned
Tripura Constructions proposes to develop 'Tripura-Nirvana', a high-rise residential complex in Tellapur. The applicant's project report states the development will be built on a net plot area of 47,677.35 square metres (11.78 acres) with a total built-up area of 2,64,904.48 square metres.
The project consists of 14 towers (Towers A to N) and a separate club house. The residential towers are designed with a configuration of two cellars, a ground floor, and 9 upper floors. The development will provide a total of 1,088 residential units, comprising 220 two-BHK flats and 868 three-BHK flats. The club house is planned as a ground-plus-four-floor structure.
| Item | Detail |
|---|---|
| Total Plot Area | 47,677.35 m2 |
| Total Built-up Area | 2,64,904.48 m2 |
| Residential Towers | 14 (G + 9 Floors) |
| Total Units | 1,088 Apartments |
| Building Height | 32.60 m |
| Estimated Population | 6,350 persons |
| Project Cost | ₹390 crore |
Layout and design
The site layout allocates 19,350 square metres (40.6%) for ground coverage. Road infrastructure within the complex will occupy 18,717.63 square metres (39.3%), while 4,770 square metres (10%) is reserved for greenbelt development.
Parking is distributed across two cellar levels (Lower and Upper). The total parking area provided is 83,890.92 square metres, which the applicant states covers 46.34% of the required area. This includes space for 1,632 four-wheelers and 2,290 two-wheelers. Internal roads will be concreted or asphalted to manage dust and traffic flow.
Land and surroundings
The project is located at Survey No. 380/P in Tellapur village. The site is a plain, private land already in the possession of the applicant. Surrounding environmental features include the Chaturi Reserve Forest (0.3 km North), Tellapur Lake (0.6 km Northwest), and Osman Nagar Lake (0.9 km South-Southwest). The site is accessible via a connecting road to National Highway 65 (4.9 km Northeast) and the Outer Ring Road (3.5 km West-Southwest).
Water, power and access
The total water requirement for the project is estimated at 863 kilolitres per day (KLD). Fresh water demand of 598.8 KLD will be sourced from municipal supplies (Mission Bhagiratha) and groundwater. The project will generate approximately 690 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 1,000 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water (621 KLD) will be recycled for flushing (240.36 KLD) and greenbelt maintenance (23.9 KLD), with the remainder discharged to the municipal sewer.
Power requirement is estimated at 5,850 kWh, to be sourced from the Telangana State Southern Power Distribution Company Limited (TSSPDCL). For emergency backup, the applicant plans to install 13 diesel generator (DG) sets of 125 kVA and one 1,000 kVA set. Energy conservation measures include the use of LED lighting and solar power for approximately 5% of the total load.
Environmental safeguards
Solid waste generation is estimated at 3,199 kg/day. This includes 1,919 kg/day of biodegradable waste, which will be treated in an organic waste converter, and 960 kg/day of non-biodegradable waste to be disposed of through authorized vendors.
For rainwater management, the applicant proposes 40 percolation pits (1.5m x 1.5m x 1.5m) along the site boundary to capture a storm water load of 715.8 cubic metres per hour. The Environmental Management Plan (EMP) has a capital budget of ₹3.95 crore and an annual recurring budget of ₹87 lakh. This covers the STP, solid waste management, and the development of a greenbelt featuring native species such as Mango, Neem, and Ashoka.
'TRIPURA-NIRVANA' High-Rise Residential Building site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.8 acres, this one is larger than 65% of them.
131 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tellapuram, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 'TRIPURA-NIRVANA' High-Rise Residential Building — cleared for impact study, 0 m away
- Aparna New Lands by M/s. Aparna Constructions and Estates Private Limited — environmental approval granted, 200 m away
- Aparna New Lands by M/s. Aparna Constructions and Estates Private Limited — cleared for impact study, 200 m away
- Building project by Sharadchandrika Infra Projects LLP — more information requested, 300 m away
- Proposed Residential complex project at Tellapur Village, Ramachandrapuram… — environmental approval granted, 350 m away
- Proposed Residential complex project at Tellapur Village, Ramachandrapuram… — cleared for impact study, 350 m away
- Proposed Residential complex project - Tellapur Technocity Pvt. Ltd. (Phase - 4) — cleared for impact study, 350 m away
- Proposed Mixed use complex : Tellapur village, Ramachandrapuram mandal,… — under environmental review, 550 m away
More from Tripura Constructions in Sangareddy
- Expansion of GREEN ALFA – High Rise Residential Building — lapsed
- Green Alfa - High-Rise Residential Apartment (Expansion) — more information requested
All 7 Tripura Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.