Environmental approval grantedBuildings & townships · Sangareddy, Telangana

'TRIPURA-NIRVANA' High-Rise Residential Building

'TRIPURA-NIRVANA' High-Rise Residential Building is an approved residential project in Tellapuram, Ramchandrapuram, Sangareddy, Telangana. It plans 1,088 units in 13 towers of up to 9 floors on 11.8 acres. Its stated project cost is ₹390 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Jun 2025).

See it on the live map All projects in Sangareddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since5 Jun 2025
Application filed29 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantTripura Constructions
UseResidential
Units1,088
Towers13
Floors (tallest)9
Basements2
Parking spaces1,632
Land area11.8 acres (4.8 ha)
Built-up area2,64,904 m² (28,51,400 sq ft)
Plot area47,677 m² (5,13,190 sq ft)
Project cost₹390 crore
Village / localityTellapuram
Taluk / tehsilRamchandrapuram
DistrictSangareddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-01426

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Apr 2025 (this page)Environmental approval granted11.8 acres₹390 crore
Early planning filed 28 Jun 2024Cleared for impact study11.8 acres₹390 crore

What the filings say

What is planned

Tripura Constructions proposes to develop 'Tripura-Nirvana', a high-rise residential complex in Tellapur. The applicant's project report states the development will be built on a net plot area of 47,677.35 square metres (11.78 acres) with a total built-up area of 2,64,904.48 square metres.

The project consists of 14 towers (Towers A to N) and a separate club house. The residential towers are designed with a configuration of two cellars, a ground floor, and 9 upper floors. The development will provide a total of 1,088 residential units, comprising 220 two-BHK flats and 868 three-BHK flats. The club house is planned as a ground-plus-four-floor structure.

ItemDetail
Total Plot Area47,677.35 m2
Total Built-up Area2,64,904.48 m2
Residential Towers14 (G + 9 Floors)
Total Units1,088 Apartments
Building Height32.60 m
Estimated Population6,350 persons
Project Cost₹390 crore

Layout and design

The site layout allocates 19,350 square metres (40.6%) for ground coverage. Road infrastructure within the complex will occupy 18,717.63 square metres (39.3%), while 4,770 square metres (10%) is reserved for greenbelt development.

Parking is distributed across two cellar levels (Lower and Upper). The total parking area provided is 83,890.92 square metres, which the applicant states covers 46.34% of the required area. This includes space for 1,632 four-wheelers and 2,290 two-wheelers. Internal roads will be concreted or asphalted to manage dust and traffic flow.

Land and surroundings

The project is located at Survey No. 380/P in Tellapur village. The site is a plain, private land already in the possession of the applicant. Surrounding environmental features include the Chaturi Reserve Forest (0.3 km North), Tellapur Lake (0.6 km Northwest), and Osman Nagar Lake (0.9 km South-Southwest). The site is accessible via a connecting road to National Highway 65 (4.9 km Northeast) and the Outer Ring Road (3.5 km West-Southwest).

Water, power and access

The total water requirement for the project is estimated at 863 kilolitres per day (KLD). Fresh water demand of 598.8 KLD will be sourced from municipal supplies (Mission Bhagiratha) and groundwater. The project will generate approximately 690 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 1,000 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water (621 KLD) will be recycled for flushing (240.36 KLD) and greenbelt maintenance (23.9 KLD), with the remainder discharged to the municipal sewer.

Power requirement is estimated at 5,850 kWh, to be sourced from the Telangana State Southern Power Distribution Company Limited (TSSPDCL). For emergency backup, the applicant plans to install 13 diesel generator (DG) sets of 125 kVA and one 1,000 kVA set. Energy conservation measures include the use of LED lighting and solar power for approximately 5% of the total load.

Environmental safeguards

Solid waste generation is estimated at 3,199 kg/day. This includes 1,919 kg/day of biodegradable waste, which will be treated in an organic waste converter, and 960 kg/day of non-biodegradable waste to be disposed of through authorized vendors.

For rainwater management, the applicant proposes 40 percolation pits (1.5m x 1.5m x 1.5m) along the site boundary to capture a storm water load of 715.8 cubic metres per hour. The Environmental Management Plan (EMP) has a capital budget of ₹3.95 crore and an annual recurring budget of ₹87 lakh. This covers the STP, solid waste management, and the development of a greenbelt featuring native species such as Mango, Neem, and Ashoka.

'TRIPURA-NIRVANA' High-Rise Residential Building site plan and layout

4 drawings from the project's filings. Sign in free to see them.

'TRIPURA-NIRVANA' High-Rise Residential Building: Site layout plan: 14 residential towers, club house, and internal road network (preview)🔒 Sign in free to see it
Site layout plan: 14 residential towers, club house, and internal road network
'TRIPURA-NIRVANA' High-Rise Residential Building: Proposed project layout showing building footprints and greenbelt areas (preview)🔒 Sign in free to see it
Proposed project layout showing building footprints and greenbelt areas
'TRIPURA-NIRVANA' High-Rise Residential Building: Location map and site coordinates (preview)🔒 Sign in free to see it
Location map and site coordinates
'TRIPURA-NIRVANA' High-Rise Residential Building: Typical rainwater recharging pit design (preview)🔒 Sign in free to see it
Typical rainwater recharging pit design

In context

350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.8 acres, this one is larger than 65% of them.

131 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tellapuram, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tripura Constructions in Sangareddy

All 7 Tripura Constructions projects across India

About this information