Quick answers
What is this project?
Submission of No Increase in Pollution Load by M/S. Symed Labs Limited, Unit-Vi Within the Existing Production Capacity of 250.0 Tpm Within the Same Area of 40.17 Acre is a proposed project in Mandollagudem, Choutuppal, Yadadri Bhuvanagiri, Telangana. The site covers 40.2 acres.
Who is building it?
The applicant is Symed Labs Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mandollagudem, Choutuppal, Yadadri Bhuvanagiri, Telangana.
How big is it?
It has a stated cost of ₹25 crore and a site of 40.2 acres.
When was it filed?
The application was filed on 19 Dec 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 19 Dec 2024 |
| Application filed | 19 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Symed Labs Limited |
| Land area | 40.2 acres (16.3 ha) |
| Project cost | ₹25 crore |
| Village / locality | Mandollagudem |
| Taluk / tehsil | Choutuppal |
| District | Yadadri Bhuvanagiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01477 |
In context
10 applications in Yadadri Bhuvanagiri since January 2022 are in the same category (Other): 0 approved, 10 filed or under review, and 0 withdrawn, lapsed or rejected. At 40.2 acres, this one is larger than 90% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandollagudem, Choutuppal, Yadadri Bhuvanagiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of Transfer of Environmental Clearance (EC) from Symed Labs… — environmental approval granted, 50 m away
- Industrial project by Sinterx Pharma Private Limited — environmental approval granted, 550 m away
- Change of Product Mix on the Basis of No Increase in Pollution Load and… — initial checks, 550 m away
- Diversion of 0.0243 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved, 2.1 km away
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of… — forest land use approved, 2.1 km away
- Diversion of 0.0057 Ha of forest land for formation of approach road to reach… — lapsed, 2.2 km away
- Diversion of 0.959 ha of Forest Land for Widening and Strengthening of… — lapsed, 2.5 km away
- Diversion of 0.0603 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved, 2.5 km away
All 3 Symed Labs projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.