Quick answers
What is this project?
Candeur Lakescape by M/S Candeur Constructions Private Limited is a proposed township project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 1,991 units in 8 towers of up to 47 floors on 10.7 acres.
Who is building it?
The applicant is Candeur Constructions Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jan 2025), as of 27 Nov 2026.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹510 crore and a site of 10.7 acres.
When was it filed?
The application was filed on 22 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Candeur Lakescape by M/S Candeur Constructions Private Limited
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jan 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Candeur Constructions Private Limited |
| Use | Township |
| Units | 1,991 |
| Towers | 8 |
| Floors (tallest) | 47 |
| Basements | 4 |
| Land area | 10.7 acres (4.3 ha) |
| Built-up area | 4,93,794 m² (53,15,149 sq ft) |
| Plot area | 43,301 m² (4,66,088 sq ft) |
| Project cost | ₹510 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01619 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 1 Feb 2025 | Environmental approval granted | 10.7 acres | ₹510 crore |
| Amendment filed 22 Oct 2024 (this page) | Cleared for impact study | 10.7 acres | ₹510 crore |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.7 acres, this one is larger than 66% of them.
93 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Candeur Lakescape by M/S Candeur Constructions Private Limited — environmental approval granted, 0 m away
- Cyberian Towers by M/s Precast Building Systems (India) Private Limited — environmental approval granted, 200 m away
- Residential Complex by M/s. Sreenidhi Luxury Homes Private Limited & Others — environmental approval granted, 300 m away
- Cyberian Villas by M/s Precast Building Systems (India) Private Limited — environmental approval granted, 400 m away
- Residential Apartments Construction Project – Residential Hi-Rise Buildings by… — environmental approval granted, 600 m away
- Residential Apartments Construction Project – Residential Hi-Rise Buildings by… — cleared for impact study, 600 m away
- Residential Apartment construction project by M/s Jaswitha Constructions and… — lapsed, 650 m away
- Residential Apartments construction project located at Survey No. 49,… — environmental approval granted, 700 m away
All 5 Candeur Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.