What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Sangareddy, Telangana

Residential Apartments construction project - IRA Aspiration – 2 by M/s IRA Blossom Fields

Residential Apartments construction project - IRA Aspiration – 2 by M/s IRA Blossom Fields is a proposed residential project in Kollur, Ramchandrapuram, Sangareddy, Telangana. The site covers 8.1 acres. Its stated project cost is ₹423 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Jun 2024).

See it on the live map All projects in Sangareddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Apartments construction project - IRA Aspiration – 2 by M/s IRA Blossom Fields

Project details

StatusCleared for impact study
Status since3 Jun 2024
Application filed1 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantIRA Blossom Fields
UseResidential
Land area8.1 acres (3.3 ha)
Built-up area1,70,747 m² (18,37,904 sq ft)
Project cost₹423 crore
Village / localityKollur
Taluk / tehsilRamchandrapuram
DistrictSangareddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-01681

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Sept 2024Environmental approval granted8.1 acres₹423 crore
Early planning filed 1 Jun 2024 (this page)Cleared for impact study8.1 acres₹423 crore

What the filings say

What is planned

IRA Blossom Fields proposes to develop a gated community of residential apartments on 3.2586 hectares (8.05 acres) of land in Kollur. The project, named IRA Aspiration – 2, is designed to provide high-density housing to meet market demand in the growing urban area of Hyderabad.

The development consists of seven blocks in total, comprising six residential blocks and one amenities block. The residential towers will have a maximum height of 15 floors above ground (2 Basements + Ground + 14 Floors). The project will provide 674 apartment units.

ItemDetail
Total Site Area3.2586 hectares
Total Built-up Area1,70,746.8 m²
Number of Residential Blocks6
Total Apartment Units674
Maximum Floors14 + Ground
Parking Capacity1,462 four-wheelers; 350 two-wheelers
Estimated Population3,500 to 4,000 persons

Layout and design

The site layout is optimized to comply with Hyderabad Metropolitan Development Authority (HMDA) regulations. The residential blocks cover a site area of 7,612.31 m², while the amenities block occupies 632.32 m². The design incorporates Indian architectural principles of "Vastu" to meet market preferences.

The circulation plan includes a 7-metre wide driveway at the ground level and 5.4-metre wide driveways within the two basement levels. Access between floors will be facilitated by 31 lifts, each with a capacity of 10 to 12 passengers. The project includes a dedicated club house and various "tot lots" for recreation. A rock outcrop at the highest point of the site will be converted into a viewpoint.

Land and surroundings

The project site is located at Survey numbers 293/Part and 294/Part in Kollur. The surroundings consist primarily of open lands in all directions. The site is connected to the Kollur Road via an existing 12-metre wide road and a proposed 30-metre wide road to the north. The Nagalapalli Railway Station is located approximately 2.28 km from the site.

The land allocation includes specific buffer zones: 1,932.37 m² for a tank buffer and 505.86 m² for a Nala (drain) buffer. A total of 5,545.65 m² is designated as open area, with an additional 2,923.99 m² for green space.

Water, power and access

During the occupation stage, the total water requirement is estimated at 490.4 kilolitres per day (KLD). The applicant plans to draw domestic water from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). To reduce fresh water demand, a dual plumbing system will be installed, using 171.9 KLD of treated wastewater for flushing and green belt irrigation. This reduces the net fresh water requirement to 318.5 KLD.

Power will be sourced from the Telangana State Southern Power Distribution Company Limited (TGSPDCL). The project includes seven diesel generator (DG) sets of 500 kVA each for emergency backup. Energy conservation measures include the use of LED lighting, solar water heaters for residential units, and solar-powered street lights and fencing.

Environmental safeguards

The project will feature an on-site Sewage Treatment Plant (STP) with a capacity of 500 m³ based on Fluidized Aerobic Bio Reactor (FAB) technology. Treated water will be reused, and any excess will be discharged into the municipal sewer line.

For storm water management, the applicant proposes 33 rainwater harvesting pits (1.5m x 1.5m x 2.0m) and one larger harvesting structure. Solid waste generation is estimated at 2,191 kg/day. The applicant plans to implement source segregation, using green bins for biodegradable waste and blue bins for recyclables. Biodegradable waste will be processed via an organic waste converter.

During construction, which is expected to last approximately 24 months, the applicant will operate a temporary in-house batching plant with a capacity of 60 m³/hr. Construction and demolition waste, estimated at 8,537.4 tons, will be segregated; bricks and demolished RCC will be reused for land filling on-site as sub-grade material.

Residential Apartments Construction Project - IRA Aspiration – 2 site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Residential Apartments Construction Project - IRA Aspiration – 2: Site Layout: Tower placement, Nala buffer, and tot-lot locations (preview)🔒 Sign in free to see it
Site Layout: Tower placement, Nala buffer, and tot-lot locations
Residential Apartments Construction Project - IRA Aspiration – 2: Typical Floor Plan and Building Section showing 14 floors and 2 basements (preview)🔒 Sign in free to see it
Typical Floor Plan and Building Section showing 14 floors and 2 basements
Residential Apartments Construction Project - IRA Aspiration – 2: Parking Floor Plan: Basement layout with driveways and ramps (preview)🔒 Sign in free to see it
Parking Floor Plan: Basement layout with driveways and ramps
Residential Apartments Construction Project - IRA Aspiration – 2: Sewage Treatment Plant: FAB technology flow diagram (preview)🔒 Sign in free to see it
Sewage Treatment Plant: FAB technology flow diagram

In context

350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is larger than 53% of them.

162 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kollur, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.