Quick answers
What is Mining project by M/s Venkateswara Metal Industries?
This approved mining project by M/s Venkateswara Metal Industries is in Sankireddipalle, Kothakota, Wanaparthy, Telangana. The site covers 4.9 acres.
Who is building it?
The applicant is N Masanna.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Mar 2025), as of 27 Nov 2026.
Where is it?
In Sankireddipalle, Kothakota, Wanaparthy, Telangana.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 19 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Mar 2025 |
| Application filed | 19 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | N Masanna |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Sankireddipalle |
| Taluk / tehsil | Kothakota |
| District | Wanaparthy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01717 |
In context
20 applications in Wanaparthy since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 75% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Sankireddipalle, Kothakota, Wanaparthy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. SRI GANESH MINERALS — lapsed, 2.7 km away
- Mining project by M/S. Sri Sai Mines & Minerals — environmental approval granted, 2.9 km away
- Mining project by M/s. Sri Sai Mines & Minerals., — lapsed, 2.9 km away
- Smt R. Shivaleela — environmental approval granted, 3.5 km away
- Smt R. Shivaleela — more information requested, 3.5 km away
- Diversion of the Forest Land for Construction of Bypass Road to Wanaparthy… — lapsed, 7.8 km away
- Diversion of 0.1485 Ha for setup for Bus Shelter, Water Tank and Mini… — lapsed, 8.4 km away
- Diversion of 0.3548 Ha of Forest Land in Wanaparthy Division for Laying of… — lapsed, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.