One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Change in Product Mix by retaining existing/permitted production capacity and…
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Oct 2024 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Alkimia Pharma-Chem Private Limited |
| Use | Industrial |
| Land area | 9.5 acres (3.9 ha) |
| Plot area | 38,520 m² (4,14,625 sq ft) |
| Project cost | ₹22.7 crore |
| Village / locality | Chiragpalli |
| Taluk / tehsil | Zahirabad |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01758 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Jul 2026 | Initial checks | 9.5 acres | ₹22.7 crore |
| New project filed 9 Oct 2024 (this page) | Initial checks | 9.5 acres | ₹22.7 crore |
In context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.5 acres, this one is larger than 58% of them.
Where it is
Chiragpalli, Zahirabad, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Change in Product Mix by retaining existing/permitted production… — initial checks, 0 m away
- Diversion of 0.3409 Ha of Forest Land for Formation of Approach Road to Reach… — lapsed, 8.2 km away
- Diversion of 0.8002 Ha of Forest Land — forest land use approved, 8.6 km away
- Diversion of 1.1114 Ha of Forest Land — lapsed, 8.6 km away
- Submission of No Increase in Pollution Load by M/s. Sri Vyjayanthi Labs Pvt.… — initial checks, 10.9 km away
- Submission of No Increase in Pollution Load by M/s. Sri Vyjayanthi Labs Pvt.… — initial checks, 10.9 km away
- Submission for EC Corrigendum application by Sri Vyjayanthi Labs Private… — lapsed, 11 km away
- Industrial project by Sri Vyjayanthi Labs Private Limited — environmental approval granted, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.