Quick answers
What is this project?
Proposed Expansion (Phase – 2) of "Electronics Manufacturing Unit" by Chang Yi Interconnect Technology (India) Private Limited (A 100% subsidiary of Foxconn Interconnect Technology Limited (FIT), Taiwan) is a withdrawn building project in Kongara Kalan, Ibrahimpatnam, Ranga Reddy, Telangana. The site covers 120 acres.
Who is building it?
The applicant is Chang Yi Interconnect Technology (India) Private Limited.
Has it been approved?
No. The application was withdrawn on 30 Dec 2024, so it is no longer under consideration.
Where is it?
In Kongara Kalan, Ibrahimpatnam, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹4,775.7 crore and a site of 120 acres.
When was it filed?
The application was filed on 9 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion (Phase – 2) of "Electronics Manufacturing Unit" by Chang Yi…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 30 Dec 2024 |
| Application filed | 9 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Chang Yi Interconnect Technology (India) Private Limited |
| Use | Other |
| Land area | 120 acres (48.6 ha) |
| Project cost | ₹4,775.7 crore |
| Village / locality | Kongara Kalan |
| Taluk / tehsil | Ibrahimpatnam |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01761 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 9 Dec 2024 (this page) | Withdrawn | 120 acres | ₹4,775.7 crore |
| Early planning filed 20 Jul 2024 | Cleared for impact study | 120 acres | ₹4,775.7 crore |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 120 acres, this one is larger than 98% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kongara Kalan, Ibrahimpatnam, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion (Phase – 2) of "Electronics Manufacturing Unit" by Chang Yi… — cleared for impact study, 0 m away
- Electronics Manufacturing Unit by Chang Yi Interconnect Technology (India) Pvt… — environmental approval granted, 0 m away
- Industrial project by M/s. TSIIC proposes to Develop the Electronic… — cleared for impact study, 150 m away
- Residential Villas Construction Project - Villora by M/s. Aarnika Infra LLP — environmental approval granted, 850 m away
- Residential Apartments by M/s. SRK INFRAS and Others — environmental approval granted, 900 m away
- Ko-Hub Warehousing by M/s Sai Sankalpa Infra Projects Private Limited — initial checks, 950 m away
- Ko-Hub Warehousing by M/s Sai Sankalpa Infra Projects Private Limited — environmental approval granted, 950 m away
- Residential Villas "Ark Aryama" by Sri. Gummi Ram Reddy & Others — environmental approval granted, 2.6 km away
More from Chang Yi Interconnect Technology (India) Private Limited in Ranga Reddy
- Electronics Manufacturing Unit by Chang Yi Interconnect Technology (India) Pvt… — environmental approval granted
All 3 Chang Yi Interconnect projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.