Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Jan 2025 |
| Application filed | 14 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gemcity Builders LLP |
| Use | Residential |
| Units | 520 |
| Towers | 3 |
| Floors (tallest) | 23 |
| Basements | 3 |
| Parking spaces | 1,378 |
| Land area | 4.9 acres (2 ha) |
| Built-up area | 1,31,144 m² (14,11,621 sq ft) |
| Plot area | 19,670 m² (2,11,726 sq ft) |
| Project cost | ₹320 crore |
| Village / locality | Ramachandrapuram |
| Taluk / tehsil | Ramchandrapuram |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01774 |
In context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 65% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ramachandrapuram, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Multi storied Residential Buildings named "Samala's Sunshine" by M/s. Samala… — environmental approval granted, 900 m away
- Proposed for Expansion of Existing Lithium Based Products Manufacturing Unit… — environmental approval granted, 1.9 km away
- Submission of Transfer of Environmental Clearance (EC) from M/s. Buli… — environmental approval granted, 1.9 km away
- Proposed for Expansion of Existing Lithium Based Products Manufacturing Unit… — lapsed, 1.9 km away
- Proposed for Expansion of Existing Lithium Based Products Manufacturing Unit… — cleared for impact study, 1.9 km away
- Industrial project by Virchow Petrochemical Pvt Ltd — environmental approval granted, 1.9 km away
- Building project by M/s Avantika Constructions — environmental approval granted, 2 km away
- Building project by M/s Avantika Constructions — cleared for impact study, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.