Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Mar 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Srimantha Rocks |
| Land area | 7.3 acres (2.9 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Bodulabonda |
| Taluk / tehsil | Nelakondapalli |
| District | Khammam |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01801 |
In context
125 applications in Khammam since January 2022 are in the same category (Mining): 86 approved, 14 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.3 acres, this one is larger than 73% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 28.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Bodulabonda, Nelakondapalli, Khammam, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bairu Harinadha Babu Granites — environmental approval granted, 300 m away
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — initial checks, 350 m away
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — cleared for impact study, 350 m away
- Opencast Other Than Fully Mechanized Mining Method for Black Granite With an… — cleared for impact study, 600 m away
- Mining project by M/s Magma Granite Industries — environmental approval granted, 1.5 km away
- Sri S Venkateswar Rao — environmental approval granted, 1.9 km away
- Proposed for Black Granite quarry of M/s. Sri Bhadradri Granites -1.0 ha… — environmental approval granted, 2.1 km away
- Mining project by M/s. Siddi Vinayaka Granites — initial checks, 2.2 km away
More from Srimantha Rocks in Khammam
- Srimantha Rocks — environmental approval granted
- Mining project by M/s. Srimantha Rocks — environmental approval granted
- Mining project by M/s. Srimantha Rocks- 4.0 Ha — environmental approval granted
- Mining project by M/s. Srimantha Rocks-0.87 Ha — environmental approval granted
- Mining project by M/s. Srimantha Rocks -1.74 Ha — environmental approval granted
- M/s. Srimantha Rocks -black granite quarry-1.0 ha -Granite recovery@2738.5… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.