One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s Raja Rajeshwara Stone Crusher
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Mar 2025 |
| Application filed | 12 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chinthireddy Buchireddy |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Nekkonda |
| Taluk / tehsil | Nekkonda |
| District | Warangal |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01903 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Jul 2024 (this page) | Environmental approval granted | 2.5 acres | ₹25 lakh |
| New project filed 12 Jul 2024 | Environmental approval granted | 11.2 acres | ₹65 lakh |
In context
26 applications in Warangal since January 2022 are in the same category (Mining): 18 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nekkonda, Warangal, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Raja Rajeshwara Stone Crusher — environmental approval granted, 50 m away
- Mining project by M/s Sai Ganesh Granites — environmental approval granted, 4.8 km away
- 3.90 Ha. of Building Stone and Road Metal Quarry of Sri Rapole Sesha Reddy,… — environmental approval granted, 5.3 km away
- Proposed Semi Mechanized Opencast Mining Method Quarrying for Expansion of… — environmental approval granted, 7.6 km away
- Proposed Semi Mechanized Opencast Mining Method Quarrying for Expansion of… — environmental approval granted, 7.6 km away
- Mining project by M/s. RVR Granites – 2.882 Ha — environmental approval granted, 7.6 km away
- Mining project by M/s Lakshmi Granites — lapsed, 7.6 km away
- Mining project by M/s Lakshmi Granites-2.95 Ha., — environmental approval granted, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.