Quick answers
What is this project?
Commercial Office Building Construction Project by M/s. Paradigm Corporation Private Limited at Survey no. 115/35 at Nanakramguda, Serilingampally Mandal and in Survey no. 333 (part) in Pupppalaguda, Rajendranagar Mandal, Ranga Reddy District is an approved commercial project in Puppalguda (Og), Gandipet, Ranga Reddy, Telangana. It plans 1 tower of up to 18 floors on 2.7 acres.
Who is building it?
The applicant is Paradigm Corporation Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Dec 2024), as of 27 Nov 2026.
Where is it?
In Puppalguda (Og), Gandipet, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹261 crore and a site of 2.7 acres.
When was it filed?
The application was filed on 23 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Dec 2024 |
| Application filed | 23 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Paradigm Corporation Private Limited |
| Use | Commercial |
| Towers | 1 |
| Floors (tallest) | 18 |
| Basements | 5 |
| Parking spaces | 1,384 |
| Land area | 2.7 acres (1.1 ha) |
| Built-up area | 1,20,754 m² (12,99,784 sq ft) |
| Plot area | 10,966 m² (1,18,037 sq ft) |
| Project cost | ₹261 crore |
| Village / locality | Puppalguda (Og) |
| Taluk / tehsil | Gandipet |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01920 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 74% of them.
317 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puppalguda (Og), Gandipet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Office Building project by M/s. Cyient Limited — lapsed, 150 m away
- Splitting of Environmental clearance issued vide order no. SEIAA /TS / OL /… — environmental approval granted, 200 m away
- Hotel Building Construction Project by M/s. IHHR Hospitality (Andhra) Private… — environmental approval granted, 300 m away
- Construction of Hotel & Office Building by M/s. ARS Hotels — environmental approval granted, 350 m away
- CINQ by M/s PHOENIX TECH ZONE PRIVATE LIMITED — environmental approval granted, 450 m away
- Residential Apartments construction project - CINQ by RAGHAVA by M/s Raghava… — environmental approval granted, 450 m away
- Residential Apartments construction project - CINQ by RAGHAVA by M/s Raghava… — cleared for impact study, 450 m away
- Sri. Ravi Suresh — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.