What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Sangareddy, Telangana

ELINOR High-rise Residential Apartments By Hirize Ventures LLP & Others at Sy. Nos. 146 (P) Kollur Village, Ramachandrapuram Mandal, Sangareddy District-502300

ELINOR High-rise Residential Apartments By Hirize Ventures LLP & Others at Sy. Nos. 146 (P) Kollur Village, Ramachandrapuram Mandal, Sangareddy District-502300 is a proposed residential project in Kollur, Ramchandrapuram, Sangareddy, Telangana. It plans 5 towers on 10.4 acres. Its stated project cost is ₹825 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Nov 2024).

See it on the live map All projects in Sangareddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: ELINOR High-rise Residential Apartments By Hirize Ventures LLP & Others at Sy. Nos. 146…

Project details

StatusCleared for impact study
Status since14 Nov 2024
Application filed24 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantHirize Ventures LLP
UseResidential
Towers5
Land area10.4 acres (4.2 ha)
Built-up area5,35,261 m² (57,61,496 sq ft)
Project cost₹825 crore
Village / localityKollur
Taluk / tehsilRamchandrapuram
DistrictSangareddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02064

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Dec 2024Environmental approval granted10.4 acres₹825 crore
Early planning filed 24 Oct 2024 (this page)Cleared for impact study10.4 acres₹825 crore

What the filings say

What is planned

Hirize Ventures LLP & Others has proposed the construction of a high-rise residential development named "ELINOR High-rise Residential Apartments" in Kollur. The applicant's project report states the development will consist of 2,056 residential units distributed across five towers and a clubhouse. All five towers (Tower-1 to Tower-5) are planned with a configuration of four basements, a ground floor, and 46 upper floors, reaching a height of 148.60 metres. The clubhouse is designed with a ground floor and six upper floors plus a terrace floor, with a height of 28.00 metres.

The residential units include various configurations: 15 units of 1 BHK, 186 units of 2 BHK, 188 units of 2.5 BHK, and 1,667 units of 3 BHK. Refuge floors are planned for the 18th, 28th, and 37th floors of each residential tower. The total built-up area is 5,35,261.46 square metres, which includes 1,42,795.36 square metres for residential basements and 2,965.02 square metres for clubhouse parking.

Key Figures

ItemDetail
Total Site Area4.21 hectares (10.41 acres)
Net Site Area3.97 hectares (9.82 acres)
Total Built-up Area5,35,261.46 square metres
Total Residential Units2,056
Number of Towers5 (4B+G+46 Floors)
Total Parking Capacity4,400 vehicles (3,500 cars, 900 two-wheelers)
Estimated Project Cost₹825 crore
Construction PeriodApproximately 4.5 years

Layout and design

The project layout allocates 20.29% of the net site area (8,066.28 square metres) for residential buildings and 3.15% for amenities. A significant portion, 33.64%, is dedicated to roads, while 10.49% (4,170.35 square metres) is reserved for green areas. Open spaces account for 28.77% of the site. The project includes four levels of common basements for parking and services. The clubhouse will feature a swimming pool, gymnasium, multipurpose hall, and various indoor sports courts.

Land and surroundings

The site is located at Survey Number 146 (P) in Kollur Village. The total site area is 4.21 hectares, but 2,378.54 square metres are affected by a 30-metre road widening, leaving a net site area of 3.97 hectares. The surrounding land consists primarily of open fields. To the north is an existing 24-metre wide road, and a 30-metre wide road is proposed along the southern boundary. The site is approximately 0.44 km from the Nehru Outer Ring Road (ORR) and 2.67 km from the Nagulapally Railway Station.

Water, power and access

During the occupation phase, the total water requirement is estimated at 1,746 kilolitres per day (KLD). Fresh water demand of 1,116 KLD will be met through public supply, borewells, or tankers. The project plans to generate 1,493 KLD of sewage, to be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 1,800 KLD. Treated water (1,314 KLD) will be reused for flushing (630 KLD) and greenery, with a surplus of 684 KLD intended for nearby municipal maintenance.

Power requirement is estimated at 5,398 KVA, sourced from the Southern Power Distribution Company of Telangana Limited (TGSPDCL). For backup, the applicant proposes two 1,500 KVA and two 1,010 KVA diesel generator sets. Solar power is planned to offset 200 KW of the common area load.

Environmental safeguards

The applicant proposes to plant 480 native trees as part of a greenbelt development program with a budget of ₹15 lakh. For rainwater management, 27 recharge pits are planned, each with a volume of 12.43 cubic metres. Solid waste management includes an on-site organic waste converter with a capacity of 2,590 kg/day to handle biodegradable waste. Inorganic waste (3,880 kg/day) will be disposed of through authorized municipal vendors. The Environmental Management Plan (EMP) has a total capital budget of ₹699.5 lakh, covering both construction and occupational stages.

Hirize Ventures LLP ELINOR High-rise Residential Apartments site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Hirize Ventures LLP ELINOR High-rise Residential Apartments: Site plan: tower locations, internal roads, and amenity block (preview)🔒 Sign in free to see it
Site plan: tower locations, internal roads, and amenity block
Hirize Ventures LLP ELINOR High-rise Residential Apartments: Proposed site layout showing building footprints and green areas (preview)🔒 Sign in free to see it
Proposed site layout showing building footprints and green areas
Hirize Ventures LLP ELINOR High-rise Residential Apartments: Section and elevation plan for Tower 1 (preview)🔒 Sign in free to see it
Section and elevation plan for Tower 1
Hirize Ventures LLP ELINOR High-rise Residential Apartments: Technical drawing of the proposed rain water harvesting structure (preview)🔒 Sign in free to see it
Technical drawing of the proposed rain water harvesting structure

In context

350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.4 acres, this one is larger than 61% of them.

200 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kollur, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hirize Ventures LLP in Sangareddy

All 3 Hirize Ventures projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.