What is Developing? Open the mapMap

LapsedBuildings & townships · Ranga Reddy, Telangana

Commercial Building Construction Project by Sri Aditya Homes Private Limited located at Survey Nos. 127/P, 128, 129, 130/P, 131/P of Narsingi Village, Gandipet Mandal, Ranga Reddy District

Commercial Building Construction Project by Sri Aditya Homes Private Limited located at Survey Nos. 127/P, 128, 129, 130/P, 131/P of Narsingi Village, Gandipet Mandal, Ranga Reddy District is a lapsed building project in Narsingi, Gandipet, Ranga Reddy, Telangana. The site covers 8 acres. Its stated project cost is ₹285.9 crore. As of 27 Nov 2026, its status is “Lapsed” (since 23 Nov 2025).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Commercial Building Construction Project by Sri Aditya Homes Private Limited located at Survey Nos. 127/P, 128, 129, 130/P, 131/P of Narsingi Village, Gandipet Mandal, Ranga Reddy District is a lapsed building project in Narsingi, Gandipet, Ranga Reddy, Telangana. The site covers 8 acres.

Who is building it?

The applicant is Sri Aditya Homes PVT. LTD.,.

Has it been approved?

No. The application was lapsed on 23 Nov 2025, so it is no longer under consideration.

Where is it?

In Narsingi, Gandipet, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹285.9 crore and a site of 8 acres.

When was it filed?

The application was filed on 4 Aug 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Commercial Building Construction Project by Sri Aditya Homes Private Limited located at…

Project details

StatusLapsed
Status since23 Nov 2025
Application filed4 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSri Aditya Homes PVT. LTD.,
Land area8 acres (3.2 ha)
Project cost₹285.9 crore
Village / localityNarsingi
Taluk / tehsilGandipet
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02123

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Aug 2025 (this page)Lapsed8 acres₹285.9 crore
Early planning filed 16 May 2025Cleared for impact study8 acres₹285.9 crore

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8 acres, this one is larger than 58% of them.

278 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Narsingi, Gandipet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sri Aditya Homes PVT. LTD., in Ranga Reddy

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.