Quick answers
What is this project?
Proposed Expansion of Buildings By M/s. Symbiosis International University (SIU) CAMPUS is a proposed education project in Mamidipalli, Nandigama, Ranga Reddy, Telangana. The site covers 40 acres.
Who is building it?
The applicant is Symbiosis.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jul 2025), as of 27 Nov 2026.
Where is it?
In Mamidipalli, Nandigama, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹120 crore and a site of 40 acres.
When was it filed?
The application was filed on 4 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Buildings By M/s. Symbiosis International University (SIU) CAMPUS
Project details
| Official title | Construction of Proposed Expansion of Buildings By M/s. Symbiosis International University (SIU) CAMPUS |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Jul 2025 |
| Application filed | 4 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Symbiosis |
| Use | Education |
| Land area | 40 acres (16.2 ha) |
| Built-up area | 1,71,136 m² (18,42,091 sq ft) |
| Project cost | ₹120 crore |
| Village / locality | Mamidipalli |
| Taluk / tehsil | Nandigama |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site area on record |
| Our reference | WID-TG-02137 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Jan 2026 | Environmental approval granted | 40 acres | ₹120 crore |
| Early planning filed 4 Jul 2025 (this page) | Cleared for impact study | 40 acres | ₹120 crore |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40 acres, this one is larger than 91% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mamidipalli, Nandigama, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Buildings By M/s. Symbiosis International University… — environmental approval granted, 50 m away
- Industrial project by M/s. Jagriti Steel Private Limited — under environmental review, 1.6 km away
- Industrial project by M/s. MAHA SHIV SHAKTI STEEL ROLLING MILL PVT LTD — environmental approval granted, 1.7 km away
- Meera Shantivanam (Phase-VII) Residential Apartments — environmental approval granted, 2.4 km away
- Building project by Lakshmi Infratech India Private Limited — more information requested, 2.8 km away
- Meera Integrated Township — environmental approval granted, 4.2 km away
- Meera Integrated Township — cleared for impact study, 4.2 km away
- Increase in production from 124.5 TPD to 180.0TPD and, Grant of EC to M/s.… — cleared for impact study, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.