Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jun 2025 |
| Application filed | 2 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ghouse Khan |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Lingareddipalli |
| Taluk / tehsil | Toopran |
| District | Medak |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02160 |
In context
29 applications in Medak since January 2022 are in the same category (Mining): 18 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Lingareddipalli, Toopran, Medak, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Al-Meezan Metal Industry, 1.0 Ha, Building Stone and Road Metal Mine,… — lapsed, 0 m away
- Sri. Mohammad Haroon Ansari, Building Stone & Road Metal Mine,1.0 Ha,… — environmental approval granted, 250 m away
- Mining project by M/s Sri Venkateshwara Stone Metal — environmental approval granted, 3.1 km away
- M/S. Sri Venkateshwara Stone Metal - Semi Mechanized Opencast Quarrying in an… — environmental approval granted, 3.5 km away
- Mining project by M/s Vijaya Laxmi Stone Metal (P) LTD — cleared for impact study, 3.8 km away
- Change of Product Mix on the Basis of No Increase in Pollution Load and… — initial checks, 3.8 km away
- M/s Deccan Robo Sand,.5.0 Ha Building Stone and Road Metal mine, Survey No.… — environmental approval granted, 3.9 km away
- Laying of Ug Steel Gas Pipeline for the Supply of Piped Natural Gas With in… — forest land use approved, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.