Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Jul 2025 |
| Application filed | 6 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | RR minerals |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Madharam |
| Taluk / tehsil | Jinnaram |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02529 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Sept 2025 | Environmental approval granted | 9.9 acres | ₹1 crore |
| Early planning filed 6 May 2025 (this page) | Cleared for impact study | 9.9 acres | ₹1 crore |
In context
127 applications in Sangareddy since January 2022 are in the same category (Mining): 90 approved, 19 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 59% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 169 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Madharam, Jinnaram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — environmental approval granted, 0 m away
- Proposed to conduct semi-mechanized opencast mining method for Road Metal and… — lapsed, 0 m away
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — environmental approval granted, 100 m away
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — cleared for impact study, 100 m away
- Mining project by M/s. PPR M SAND LLP — cleared for impact study, 200 m away
- Amendment to Environmental Clearance for change in the mine lease area and… — environmental approval granted, 250 m away
- Amendment to Environmental Clearance for change in the mine lease area for the… — environmental approval granted, 350 m away
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — environmental approval granted, 450 m away
More from RR minerals in Sangareddy
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — environmental approval granted
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method for… — cleared for impact study
- Proposed to conduct semi-mechanized opencast mining method for Road Metal and… — lapsed
All 5 RR minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.