Project details
| Official title | Proposed construction of Residential Apartments Building project at Survey No. 330/2, 330/3/A, 330/3/AA, 330/3/E & 330/3/EE, Situated at Sulthanpur Village, Ameenpur Mandal, Under HMDA, Sangareddy District, Telangana State by Name "M/s M THREE PROJECTS" |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Jun 2025 |
| Application filed | 28 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vushke Bavi Madhava Reddy |
| Use | Residential |
| Units | 270 |
| Towers | 4 |
| Floors (tallest) | 6 |
| Parking spaces | 270 |
| Land area | 3 acres (1.2 ha) |
| Built-up area | 36,434 m² (3,92,172 sq ft) |
| Plot area | 12,141 m² (1,30,685 sq ft) |
| Project cost | ₹85 crore |
| Village / locality | Sultanpur |
| Taluk / tehsil | Ameenpur |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02532 |
In context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3 acres, this one is smaller than 79% of them.
62 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sultanpur, Ameenpur, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of existing rolling mill for manufacturing of TMT Bars, CTD… — cleared for impact study, 750 m away
- Industrial project by Meenakshi Smelter & Rollers PVT LTD — environmental approval granted, 800 m away
- Industrial project by Meenakshi Smelter & Rollers PVT LTD — cleared for impact study, 800 m away
- Residential Villas Construction Project by M/s. IDREAM SAI RK INFRA — environmental approval granted, 850 m away
- Proposed Change in Product Mix without increase in production capacity and… — initial checks, 1.4 km away
- Project by M/s. Island Veer Chemie Pvt Ltd — initial checks, 1.6 km away
- Project by M/s. Sri Krishna Pharmaceuticals Limited, unit- IV — initial checks, 1.6 km away
- Quarry Lease area of 2.00 hects of Md. Zameer — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.