Quick answers
What is this project?
Residential Apartments Construction Project. - Vasavi Avani by M/s Vasavi builders LLP and Others is a rejected residential project in Kukatpally, Medchal Malkajgiri, Telangana. It plans 1,528 units in 5 towers of up to 35 floors on 10 acres.
Who is building it?
The applicant is Vasavi builders LLP.
Has it been approved?
No. The application was rejected on 23 Sept 2026.
Where is it?
In Kukatpally, Medchal Malkajgiri, Telangana.
How big is it?
It has a stated cost of ₹900 crore and a site of 10 acres.
When was it filed?
The application was filed on 31 Oct 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Apartments Construction Project. - Vasavi Avani by M/s Vasavi builders LLP…
Project details
| Status | Not approved |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 31 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vasavi builders LLP |
| Use | Residential |
| Units | 1,528 |
| Towers | 5 |
| Floors (tallest) | 35 |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹900 crore |
| Village / locality | Kukatpally |
| Taluk / tehsil | Kukatpally |
| District | Medchal Malkajgiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02575 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Oct 2025 (this page) | Not approved | 10 acres | ₹900 crore |
| Early planning filed 13 Jul 2024 | Cleared for impact study | 10 acres | ₹900 crore |
What the filings say
What is planned
Vasavi builders LLP and Others proposes to develop a gated residential community named Vasavi Avani on 4.056 hectares (10.02 acres) of land in Kukatpally. The applicant's project report describes a high-rise development consisting of 1,528 residential units across seven blocks.
The project components include:
- Residential Blocks: Five blocks reaching a maximum height of 36 floors above ground (4 Cellars + Ground + 35 floors).
- Amenities: Two blocks with a height of 4 floors (4 Cellars + Ground + 3 floors).
- Parking: Four cellar floors and a stilt floor dedicated to parking.
Project Area Statement
| Item | Detail |
|---|---|
| Total Site Area | 40,569.72 m² |
| Net Site Area | 36,089.70 m² |
| Total Built-up Area | 3,86,389.4 m² |
| Residential Built-up Area | 2,67,793.68 m² |
| Amenities Built-up Area | 6,152.84 m² |
| Parking Area | 1,12,442.89 m² |
| Green Area | 3,660.61 m² |
| Road Area | 10,548.13 m² |
| Open Area | 5,102.91 m² |
| Sluice Channel & Buffer | 1,416.40 m² |
| Road Widening Area | 3,063.63 m² |
Layout and design
The site circulation plan includes a 30 m wide connecting road and 11 m wide internal driveways at the ground level. Four ramps, each 3.6 m wide with a 1-in-8 slope, provide access to the four cellar levels. The project will feature 33 lifts with capacities ranging from 10 to 15 passengers each.
Parking is planned for 2,203 four-wheelers and 480 two-wheelers. The design incorporates open spaces between units to maximize natural sunlight and reduce energy demand. A rock outcrop at the highest point of the site is proposed to be converted into a viewpoint.
Land and surroundings
The project is located in Shamshiguda village, Kukatpally. The site is currently surrounded by open lands in most directions, with existing residential buildings to the east. The nearest rail link is the Hi-Tech City railway station, located approximately 4.48 km away.
The site is situated on the downstream side of Ambeer Cheruvu (also known as Pragathi Nagar Lake). The applicant has obtained approval from the Irrigation and Command Area Development (I&CAD) Department for the layout, which includes a bund buffer area of 1,518.23 m².
Water, power and access
Water: During the occupation stage, the total water requirement is estimated at 1,111.6 kilolitres per day (KLD). The applicant proposes to draw 722 KLD from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). The remaining 389.6 KLD will be met through recycled treated wastewater used for flushing. Construction water needs are estimated at 100 m³/day, peaking at 200 m³/day, sourced from ground water or municipal tankers.
Power: Electricity will be drawn from the Telangana State Southern Power Distribution Company Limited (TGSPDCL). The total connected load is estimated at 11,762 kW. For emergency backup, seven diesel generator (DG) sets of 600 kVA each are proposed for the occupation phase, with one 150 kVA set for construction.
Access: The site connects to Pragathi Nagar Road via an existing 30 m wide road on the west.
Environmental safeguards
Waste Management: The project is expected to generate 4,966 kg/day of municipal solid waste. This will be segregated into biodegradable (2,384 kg) and non-biodegradable waste. An organic waste converter with a capacity of 2,390 kg is proposed. Construction debris, estimated at 19,319.47 tons, will be segregated; bricks and demolished RCC will be used for land filling as subgrade.
Sewage Treatment: An on-site Sewage Treatment Plant (STP) with a capacity of 1,200 KLD is planned, utilizing Sequential Batch Reactor (SBR) technology. Treated water will be reused for flushing and green belt development, with excess discharged into the municipal sewer line.
Drainage: A closed drainage network with silt traps is proposed. Stormwater will be managed through 20 rainwater harvesting pits (1.5m x 1.5m x 2m) and five storage sumps of 90 m³ each for domestic reuse.
Energy Conservation: The applicant proposes using LED lighting, solar power for external lighting, and solar water heaters for 600 units, estimated to save 43.26 lakh units of electricity annually.
Timeline
The applicant's conceptual plan estimates a construction period of approximately 36 months.
Residential Apartments Construction Project. - Vasavi Avani site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
394 applications in Medchal Malkajgiri since January 2022 are in the same category (Buildings & townships): 300 approved, 54 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10 acres, this one is larger than 73% of them.
104 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kukatpally, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Apartments Construction Project. - Vasavi Avani by M/s Vasavi… — cleared for impact study, 0 m away
- Residential Apartments Construction Project by Vasavi Avani by M/s Vasavi… — under environmental review, 0 m away
- Residential Apartments Construction Project by Vasavi Avani by M/s Vasavi… — under environmental review, 0 m away
- Residential Apartments Construction Project located at Survey No. 46,… — lapsed, 300 m away
- Building project by M/s. Excella Properties — lapsed, 1000 m away
- Speed Homes By M/s. Speed Homes LLP — environmental approval granted, 1.3 km away
- Praneeth Pranav Ixora by M/s. Venkata Praneeth Developers Private Limited — cleared for impact study, 1.4 km away
- Praneeth Pranav Ixora by M/s Venkata Praneeth Developers Private Limited — environmental approval granted, 1.4 km away
More from Vasavi builders LLP in Medchal Malkajgiri
- Residential Apartments Construction Project by Vasavi Avani by M/s Vasavi… — under environmental review
- Residential Apartments Construction Project by Vasavi Avani by M/s Vasavi… — under environmental review
All 4 Vasavi builders projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.