Cleared for impact studyMining · Ranga Reddy, Telangana

3.318 Ha. of Building Stone, Road Metal & Rough Stone mine of Smt. E. Manjula , Sy.No.461/ Part of Rachaloor Village, Kandukur Mandal, Rangareddy District, T.G.

3.318 Ha. of Building Stone, Road Metal & Rough Stone mine of Smt. E. Manjula , Sy.No.461/ Part of Rachaloor Village, Kandukur Mandal, Rangareddy District, T.G is a proposed mining project in Rachlur, Kandukur, Ranga Reddy, Telangana. The site covers 8.2 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Oct 2025).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

3.318 Ha. of Building Stone, Road Metal & Rough Stone mine of Smt. E. Manjula , Sy.No.461/ Part of Rachaloor Village, Kandukur Mandal, Rangareddy District, T.G is a proposed mining project in Rachlur, Kandukur, Ranga Reddy, Telangana. The site covers 8.2 acres.

Who is building it?

The applicant is Manjula Reddy Eanugu.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Oct 2025), as of 27 Nov 2026.

Where is it?

In Rachlur, Kandukur, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹90 lakh and a site of 8.2 acres.

When was it filed?

The application was filed on 24 Aug 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: 3.318 Ha. of Building Stone, Road Metal & Rough Stone mine of Smt. E. Manjula ,…

Project details

StatusCleared for impact study
Status since6 Oct 2025
Application filed24 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantManjula Reddy Eanugu
Land area8.2 acres (3.3 ha)
Project cost₹90 lakh
Village / localityRachlur
Taluk / tehsilKandukur
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02581

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Mar 2026Environmental approval granted8.2 acres₹90 lakh
Early planning filed 24 Aug 2025 (this page)Cleared for impact study8.2 acres₹90 lakh

In context

99 applications in Ranga Reddy since January 2022 are in the same category (Mining): 82 approved, 6 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.2 acres, this one is smaller than 56% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 32.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.

Where it is

Rachlur, Kandukur, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.