Quick answers
What is this project?
This approved residential project by M/s Casagrand Hyderwise Private Limited is in Puduru, Medchal, Medchal Malkajgiri, Telangana. It plans 153 units of up to 3 floors on 12.3 acres.
Who is building it?
The applicant is Casagrand Hyderwise Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Jul 2025), as of 27 Nov 2026.
Where is it?
In Puduru, Medchal, Medchal Malkajgiri, Telangana.
How big is it?
It has a stated cost of ₹105 crore and a site of 12.3 acres.
When was it filed?
The application was filed on 9 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building project by M/s Casagrand Hyderwise Private Limited
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Jul 2025 |
| Application filed | 9 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Casagrand Hyderwise Private Limited |
| Use | Residential |
| Units | 153 |
| Floors (tallest) | 3 |
| Land area | 12.3 acres (5 ha) |
| Built-up area | 44,962 m² (4,83,966 sq ft) |
| Plot area | 49,657 m² (5,34,503 sq ft) |
| Project cost | ₹105 crore |
| Village / locality | Puduru |
| Taluk / tehsil | Medchal |
| District | Medchal Malkajgiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02717 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 29 Aug 2025 | Environmental approval granted | 12.3 acres | ₹105 crore |
| New project filed 9 Jun 2025 (this page) | Environmental approval granted | 12.3 acres | ₹105 crore |
What the filings say
What is planned
CASAGRAND HYDERWISE PRIVATE LIMITED proposes to develop a gated community housing project in Puduru village, Medchal. The project report describes a residential layout consisting of 153 villas and a clubhouse. The villas are designed with a Ground + 2 floors structure, while the clubhouse is planned as a Ground + 3 floors building.
The total built-up area for the project is 44,962.0 square meters. This includes 43,512.0 square meters for the 153 villas and 1,450.0 square meters for the clubhouse. The project is expected to be completed within five years after obtaining all necessary permissions.
Project Components
| Item | Detail |
|---|---|
| Total Units | 153 Villas |
| Villa Structure | Ground + 2 Floors |
| Clubhouse Structure | Ground + 3 Floors |
| Total Built-up Area | 44,962.0 square meters |
| Net Plot Area | 48,066.41 square meters |
| Total Project Cost | ₹105 crore |
Layout and design
The project layout is designed around a central 12-meter wide road with internal 9-meter wide roads providing access to the individual villa plots. The site includes several designated green belt areas, totaling 4,993.73 square meters (approximately 10.39% of the net site area).
Specific areas have been earmarked for environmental buffers and infrastructure, including:
- A 9.0-meter buffer for a Topo pond (808.36 square meters).
- A 2.0-meter buffer for an irrigation channel (56.69 square meters).
- Road widening area (1,232.40 square meters).
- Utility areas for transformers and a Sewage Treatment Plant (STP).
Parking is planned with one car and two-wheeler space for each villa, plus 20 visitor car parking spaces located near the clubhouse.
Land and surroundings
The project site is located at Survey Numbers 623/Part and 626/Part in Puduru. The land is described as a plain area that currently contains 50 trees, including 40 mango trees and 10 coconut trees. The applicant has submitted an undertaking to translocate 35 mango trees that fall within the construction area to the site boundary.
Surrounding features include agricultural lands to the south, B.N.R. High School to the north, a 12-meter road to the east, and a Daikin warehouse to the west. Several water bodies are located in the vicinity, including Shamirpet cheruvu (1.9 km) and Mothukula cheruvu (11 km). A portion of the site is affected by a Topo pond and an irrigation channel, for which the applicant has obtained a No Objection Certificate from the Irrigation and Command Area Development (I&CAD) Department.
Water, power and access
Water Supply
The total water requirement is estimated at 117.5 kilolitres per day (KLD). This will be met through a combination of fresh water (82.0 KLD) and recycled water (35.5 KLD). Fresh water is expected to be sourced from borewells or municipal supply. Recycled water from the onsite STP will be used for flushing and gardening.
Power and Energy
The total power requirement is 2,000 KVA, to be sourced from the Telangana State Southern Power Distribution Company Limited (TSSPDCL). For emergency backup, a 160 KVA Diesel Generator (DG) set is proposed. Energy conservation measures include the use of LED lighting for common areas, solar power for external lighting, and building designs that utilize passive solar architectural features to reduce cooling loads.
Environmental safeguards
The project includes an onsite STP with a capacity of 115 KLD using Sequential Batch Reactor (SBR) technology. Treated wastewater will be reused within the premises, and the applicant states that no treated water will be discharged until a connection to public sewer lines is available.
Solid waste management involves segregating organic and inorganic waste. Organic waste (estimated at 285 kg/day) will be processed in an organic waste converter, while inorganic waste will be sent to authorized recyclers. STP sludge (10 kg/day) will be used as manure for the green belt. Rainwater harvesting pits are planned for each villa to recharge the groundwater table. For air quality, the DG set will be equipped with an acoustic enclosure and a stack of adequate height to meet Central Pollution Control Board norms.
Casagrand Residential Project site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
394 applications in Medchal Malkajgiri since January 2022 are in the same category (Buildings & townships): 300 approved, 54 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.3 acres, this one is larger than 79% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puduru, Medchal, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s Casagrand Hyderwise Private Limited — environmental approval granted, 0 m away
- ADV Industrial Services Private Limited -Warehousing Projects in Survey Nos.… — lapsed, 2.1 km away
- Residential Apartment Project by M/s. Mallikarjuna Hospitality Private Limited — environmental approval granted, 2.7 km away
- Residential Apartments Construction Project by M/s. Orient Blackswan Private… — environmental approval granted, 2.7 km away
- Residential Apartments by M/s. Orient Blackswan Private Limited — returned to applicant, 2.8 km away
- Smt. R. Mamatha — lapsed, 3 km away
- Landspace Palm Meadows Group — more information requested, 3.2 km away
- Re-Diversion of 0.1008 Ha Forest Land for Laying of Water Pipeline and… — initial checks, 3.2 km away
More from Casagrand Hyderwise Private Limited in Medchal Malkajgiri
- Building project by M/s. Casagrand Hyderwise Pvt Ltd — under environmental review
- Sri. Jadala Ashok Kumar and Others, Rep. by its DAGPA. Holder, M/s.Casagrand… — environmental approval granted
- Building project by M/s Casagrand Hyderwise Private Limited — environmental approval granted
10 Casagrand projects in Hyderabad
All 103 Casagrand projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.