One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Building By Sri Murarisetty Venkata Sudhakara Rao and 18 others
Project details
| Official title | Construction of Proposed Residential Building By Sri Murarisetty Venkata Sudhakara Rao and 18 others |
|---|---|
| Status | Lapsed |
| Status since | 27 Jan 2026 |
| Application filed | 1 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | K Srinivasulu |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹65 crore |
| Village / locality | Aminpur |
| Taluk / tehsil | Ameenpur |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02741 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Nov 2025 | Environmental approval granted | 2 acres | ₹68 crore |
| New project filed 1 Oct 2025 (this page) | Lapsed | 2 acres | ₹65 crore |
In context
350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 88% of them.
58 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aminpur, Ameenpur, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Building By Sri Murarisetty Venkata Sudhakara Rao and 18… — environmental approval granted, 0 m away
- Proposed Multi Storey Residential Building on Piece of land of the Plot Nos.… — environmental approval granted, 150 m away
- M/s ABODE MJ LAKE VIEW HEIGHTS (New Residential Building Project) — environmental approval granted, 500 m away
- Aaditri Everest by Aaditri Properties Private Limited — environmental approval granted, 1.3 km away
- Aaditri Everest by Aaditri Properties Private Limited — cleared for impact study, 1.3 km away
- Building project by M/s Avantika Constructions — environmental approval granted, 2 km away
- Building project by M/s Avantika Constructions — cleared for impact study, 2 km away
- Project by M/s. Island Veer Chemie Pvt Ltd — initial checks, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.